Home › ENGINE › 1GR-FE EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 2)

AIR SWITCHING VALVE (for Bank 2) > INSTALLATION

for Preparation Click here



1. INSTALL NO. 2 EMISSION CONTROL VALVE SET
  1. Install the No. 2 emission control valve set to the cylinder head cover sub-assembly LH with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A288093E01
  1. Connect the air hose assembly to the No. 2 emission control valve set with the hose clamp as shown in the illustration.
    Text in Illustration 
    *1
    Paint Mark of Air Hose Assembly
    *2
    Protrusion of No. 2 Emission Control Valve Set
    *a
    View A
    *b
    Upper of Vehicle
    *c
    LH Side of Vehicle

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the No. 2 emission control valve set connector.



2. INSTALL NO. 2 AIR TUBE


    A226792E03
  1. Install 2 new gaskets to the No. 2 air tube.
    Text in Illustration 
    *1
    New Gasket
    *2
    No. 2 Air Tube

  1. Install the No. 2 air tube to the No. 2 emission control valve set and exhaust manifold sub-assembly LH with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



3. INSTALL PURGE VSV
(Click here)