Home › ENGINE › 1GR-FE EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 2)

AIR SWITCHING VALVE (for Bank 2) > REMOVAL

for Preparation Click here



1. REMOVE PURGE VSV
(Click here)


2. REMOVE NO. 2 AIR TUBE


    A230693
  1. Remove the 2 bolts, 2 nuts and the No. 2 air tube from the No. 2 emission control valve set and exhaust manifold sub-assembly LH.

  1. Remove the 2 gaskets from the No. 2 air tube.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.



3. REMOVE NO. 2 EMISSION CONTROL VALVE SET


    A223562
  1. Disconnect the No. 2 emission control valve set connector.

  1. Loosen the hose clamp and disconnect the air hose assembly from the No. 2 emission control valve set.



    A223564
  1. Remove the 3 nuts and the No. 2 emission control valve set from the cylinder head cover sub-assembly LH.