Home › ENGINE ยท 2TR-FE › ENGINE CONTROL SYSTEM › SFI SYSTEM (w/o Secondary Air Injection System)

SFI SYSTEM (w/o Secondary Air Injection System) > HOW TO PROCEED WITH TROUBLESHOOTING

for Preparation Click here


The intelligent tester can be used in steps 3, 4, 5, 7, and 10.


1.VEHICLE BROUGHT TO WORKSHOP

    NEXT


    2.CUSTOMER PROBLEM ANALYSIS

      NEXT


      3.CONNECT INTELLIGENT TESTER TO DLC3

        HINT:
        If the display indicates a communication fault in the tool, inspect the DLC3.


      NEXT


      4.CHECK DTC AND FREEZE FRAME DATA

        HINT:
        Record or print DTC and freeze frame data, if needed (Click here).


      NEXT


      5.CLEAR DTC AND FREEZE FRAME DATA

        HINT:
        Click here.


      NEXT


      6.VISUAL INSPECTION

        NEXT


        7.SETTING CHECK (TEST) MODE DIAGNOSIS

          HINT:
          Click here.


        NEXT


        8.PROBLEM SYMPTOM CONFIRMATION

          HINT:
          If the engine does not start, perform steps 10 and 12 first.

          Result
          Proceed To
          Malfunction does not occur
          A
          Malfunction occurs
          B


        B.
        GO TO STEP 10
        A


        9.SYMPTOM SIMULATION

          NEXT


          10.DTC CHECK

            HINT:
            Click here.

            Result
            Proceed To
            Trouble code
            A
            No code
            B


          B.
          GO TO STEP 12
          A


          11.DTC CHART

            HINT:
            Click here.


          NEXT

          GO TO STEP 14


          12.BASIC INSPECTION

            HINT:
            Click here.

            Result
            Proceed To
            Malfunctioning circuit confirmed
            A
            Malfunctioning parts confirmed
            B


          B.
          GO TO STEP 17
          A


          13.PROBLEM SYMPTOMS TABLE

            HINT:
            Click here.

            Result
            Proceed To
            Malfunctioning circuit confirmed
            A
            Malfunctioning parts confirmed
            B


          B.
          GO TO STEP 17
          A


          14.CHECK ECM POWER SOURCE CIRCUIT

            NEXT


            15.CIRCUIT INSPECTION
              Result
              Proceed To
              Malfunction not confirmed
              A
              Malfunction confirmed
              B


            B.
            GO TO STEP 18
            A


            16.CHECK FOR INTERMITTENT PROBLEMS

              NEXT

              GO TO STEP 18


              17.PARTS INSPECTION

                NEXT


                18.IDENTIFICATION OF PROBLEM

                  NEXT


                  19.ADJUSTMENT OR REPAIR

                    NEXT


                    20.CONFIRMATION TEST

                      NEXT

                      END