2014-2019 Hiace · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built Oct 2014 – Dec 2014

Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 Jan 2017 – Nov 2017 from Dec 2017


1. INSTALL TORQUE CONVERTER ASSEMBLY

  1. D028165
    Using vernier calipers, measure the dimension A between the transmission and the end of surface of drive plate.

  1. C108500E02
    Aligning the matchmarks on the transmission case and torque converter assembly , engage the spline of the input shaft and turbine runner.

    NOTICE:
    Install the torque converter assembly to the input shaft in horizontally.

  1. Z036066E03
    Engage the spline of the stator shaft and stator while turning the torque converter assembly to a clockwise.

    NOTICE:
    1. Turn the torque converter assembly approximately 180°.
    2. Be sure not to damage the oil seal.
    3. Install the torque converter assembly to the input shaft in horizontally.

  1. Z036072E01
    Turn the torque converter assembly to the clockwise and align the matchmarks on the torque converter assembly and gear into the slot on the torque converter assembly.

    NOTICE:
    Do not push on the torque converter assembly when aligning the matchmarks.

  1. Z036073E01
    Using calipers and straight edge , measure the dimension B shown in the illustration and check that B is greater than A measured in step (a).

    Standard:
    Dimension B = A + 1 mm (0.04 in.) or more


2. INSTALL BREATHER PLUG HOSE

  1. C101784
    Install the breather plug hose to the automatic transmission assembly with the bolt.

    Torque:
    :
    7.5 N*m{ 75 kgf*cm , 65 in.*lbf }


3. INSTALL ENGINE MOUNTING INSULATOR ASSEMBLY REAR

  1. C101785
    Install the engine mounting insulator assembly rear with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


4. INSTALL TRANSMISSION CONTROL CABLE BRACKET NO.1

  1. C101783
    Install the transmission control cable bracket No.1 to the automatic transmission assembly with the 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }


5. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY

  1. C101782E01
    Install the automatic transmission assembly with the 5 bolts.

    Torque:
    71 N*m{ 724 kgf*cm , 52 ft.*lbf }

    HINT:
    Install the bolt so that the bracket is tighten as shown in the illustration.


6. INSTALL ENGINE MOUNTING INSULATOR ASSEMBLY REAR

  1. C101781
    Install the engine mounting insulator assembly rear with the bolt, nut and washer.

    Torque:
    98 N*m{ 999 kgf*cm , 72 ft.*lbf }

    HINT:
    Put a washer both side of the bolt and nut.


7. INSTALL DRIVE PLATE AND TORQUE CONVERTER CLUTCH SETTING BOLT

  1. C101779
    Turn the crankshaft pulley and install the 6 torque converter clutch setting bolts.

    Torque:
    41 N*m{ 420 kgf*cm , 30 ft.*lbf }

    HINT:
    First install the matchmarks bolt (Black painted).

  1. C101778E01
    Install the drive plate cover to the automatic transmission assembly with the bolt.

    Torque:
    73 N*m{ 744 kgf*cm , 54 ft.*lbf }


8. INSTALL STIFFENER PLATE RH(ATM)

  1. C230787
    Install the stiffener plate RH with the 3 bolts.

    Torque:
    71 N*m{ 724 kgf*cm , 52 ft.*lbf }

    HINT:
    Install the bolt so that the bracket is tighten as shown in the illustration.


9. INSTALL CYLINDER BLOCK INSULATOR NO.4

  1. C101776E01
    Install the cylinder block insulator.


10. INSTALL WIRE HARNESS

  1. C101775E01
    Install the wire harness to the automatic transmission assembly with the 2 bolts.

    Torque:
    5.4 N*m{ 55 kgf*cm , 47 in.*lbf }


11. INSTALL CONNECTOR

  1. w/ Speedometer Sensor:

    1. C157537E01
      Connect the speedometer sensor connector.

  1. C101772E02
    Connect the park/neutral switch connector and the temperature sensor connector.

  1. C101774E01
    Connect the speed sensor connector (SP2) and the transmission wire connector.

  1. C101773E01
    Connect the speed sensor connector (NCO).


12. INSTALL OIL COOLER TUBE

  1. C158422
    Using a 17 mm union nut wrench, install the 2 oil cooler tubes to the automatic transmission assembly.

    Torque:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Install the 3 oil cooler tube clamps with the 5 bolts.

    Torque:
    for Bolt A:
    12 N*m{ 122 kgf*cm , 8 ft.*lbf }
    for Bolt B:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
    for Bolt C:
    71 N*m{ 724 kgf*cm , 52 ft.*lbf }


    C101770E02


13. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

  1. C101771E02
    Fix the transmission control cable assembly to the control cable bracket with a clip.

  1. Install the transmission control cable assembly to the control shaft lever with the nut.

    Torque:
    15 N*m{ 150 kgf*cm , 11 ft.*lbf }


14. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY

  1. C101768E01
    Coat a new O-ring with ATF and install the oil filler tube.

  1. Install the oil filler tube with the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 8 ft.*lbf }


15. INSTALL STARTER ASSEMBLY

  1. A115883E01
    Install the starter with the bolt and 2 nuts.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }

  1. A115882E01
    Connect the wire harness to terminal 30 and install the nut.

    Torque:
    21 N*m{ 215 kgf*cm , 16 ft.*lbf }

  1. Close the terminal cap.

  1. Connect the terminal 50 connector to the starter assembly.

  1. A113410E01
    for Wide Body:
    Install the wire ground cable with the bolt.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }


16. INSTALL EXHAUST PIPE ASSEMBLY FRONT

  1. Inspect the compression spring.

    1. A077857
      Using vernier calipers, measure the free length of the compression springs.

      Minimum length:
      40.5mm (1.594 in.)

      HINT:
      If the free length is less than the minimum, replace the compression spring.

  1. A102062E03
    Install the gasket.

    1. Fully insert a new gasket to the exhaust manifold by hand.

    2. Using a wooden block, uniformly strike the gasket so that the gasket and exhaust manifold are properly fit.

      NOTICE:
      1. Be careful with the installation direction of the gasket.
      2. Do not reuse the gasket.
      3. Do not damage the gasket.
      4. To ensure a proper seal, do not use the exhaust pipe assembly front to force the gasket onto the front exhaust manifold.

  1. Connect the exhaust pipe support, and install the exhaust pipe assembly front with the 4 bolts, 2 compression springs and 2 nuts.

    Torque:
    exhaust manifold side:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }
    exhaust pipe assembly front side:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }

    NOTICE:
    After installation, check that the clearance is almost same at any point between the flanges of the exhaust manifold and exhaust pipe assembly front.


17. INSTALL PROPELLER SHAFT ASSEMBLY

  1. C102186E01
    Remove the SST from the extension housing.

  1. Install the propeller shaft assembly in the extension housing.

  1. Align the matchmarks on the propeller shaft flange and differential flange.

  1. C102185E01
    Install the propeller shaft assembly with the 4 nuts, 4 bolts and 4 washers.

    Torque:
    74 N*m{ 755 kgf*cm , 54 ft.*lbf }


18. INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO.2

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }


19. INSTALL ENGINE UNDER COVER NO.1

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }


20. CONNECT BATTERY NEGATIVE CABLE

21. ADD AUTOMATIC TRANSMISSION FLUID

22. INSPECT AUTOMATIC TRANSMISSION FLUID

HINT:
Drive the vehicle so that the engine and transmission are at normal operating temperature.

Fluid temperature:
70 to 80 °C (158 to 176 °F)

  1. D025120E01
    Park the vehicle on a level surface and set the parking brake.

  1. With the engine idling and the brake pedal depressed, move shift the lever into all positions from P to L and return to the P position.

  1. Take out the dipstick and wipe it clean.

  1. Put it back all the way.

  1. Take it out again and check that the fluid level is within the HOT range.
    If the fluid level is below the HOT range, add new fluid and recheck the fluid level. If the fluid level exceeds the HOT range, drain the fluid once, add the proper amount of new fluid and recheck the fluid level.


23. INSPECT SHIFT LEVER POSITION
  1. When shifting from P position only with ignition switch ON and depress the break pedal.

  1. Make sure that the shifting lever moves smoothly and can be moderately operated.

  1. When starting engine, make sure that the vehicle moves forward when shifting from N to D position and moves reward when shifting R position.


24. ADJUST SHIFT LEVER POSITION

  1. C101771E02
    Remove a clip, nut, and disconnect between the control shaft lever to transmission control cable assembly from the control shaft lever and transmission control cable bracket No.1.

  1. C101788E05
    Turn the control shaft lever until stop to a clockwise direction, return the control shaft lever 2 notches to N position.

  1. C101803
    Set the shift lever to N position while holding the shift lever lightly toward the R position side and install it.

    Torque:
    15 N*m{ 150 kgf*cm , 11 ft.*lbf }

    NOTICE:
    Tighten the nut with it closing up cranky.

  1. Inspect the operation condition and work.


25. CHECK EXHAUST GAS LEAKS

26. PERFORM INITIALIZATION
(Click here)
← REMOVAL (from Oct 2014)INSTALLATION (Jan 2015 – Mar 2016) →