2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jan 2015

Versions by build date: Oct 2014 – Dec 2014 from Jan 2015


1. TEMPORARILY TIGHTEN TURBOCHARGER SUB-ASSEMBLY

  1. A103068
    If replacing the turbocharger, add 20 cm3 (1.2 cu in.) of fresh oil into the turbocharger oil inlet hole and turn the turbine wheel by hand to spread oil to the bearing.

  1. A109895
    Install a new turbo to exhaust manifold gasket as shown in the illustration.

  1. A102276
    Temporarily tighten the turbocharger assembly with the 3 nuts to exhaust manifold.


2. TEMPORARILY TIGHTEN TURBO OIL INLET PIPE SUB-ASSEMBLY

  1. A113038E01
    Install a new turbo oil inlet gasket (A) and an outlet gasket (B) and temporarily tighten the turbo inlet pipe with the 2 bolts and 2 nuts.

  1. A113037
    Install a new gasket and temporarily tighten the turbo inlet pipe with the union bolt.

    HINT:
    Be sure to install the turbo oil inlet pipe with the turbo charger assembly temporarily tightened so that the positions of the turbo and cylinder block can be adjusted.


3. TEMPORARILY TIGHTEN TURBOCHARGER STAY

  1. A103071
    Temporarily tighten the turbocharger stay with the 3 bolts.


4. FULLY TIGHTEN TURBOCHARGER SUB-ASSEMBLY
  1. Tighten the turbocharger with the 3 nuts to align the turbocharger and turbo oil inlet pipe.

    Torque:
    52 N*m{ 530 kgf*cm , 38 ft.*lbf }

  1. Tighten the turbocharger stay.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. A102273E02
    Tighten the turbo oil inlet pipe.

    Torque:
    Nut A:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }
    Bolt B:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }
    Bolt C:
    26 N*m{ 260 kgf*cm , 19 ft.*lbf }


5. INSTALL TURBINE OUTLET ELBOW
  1. Install a new gasket to the turbocharger.

  1. A102272
    Install the turbine outlet elbow with 4 new bolts.

    Torque:
    26 N*m{ 260 kgf*cm , 19 ft.*lbf }


6. INSTALL EXHAUST PIPE ASSEMBLY FRONT (for Long Wheelbase)

  1. Inspect the compression spring.

    1. A077857
      Using vernier calipers, measure the free length of the compression springs.

      Minimum length:
      40.5mm (1.594 in.)

      HINT:
      If the free length is less than the minimum, replace the compression spring.

  1. A102062E03
    Install the gasket.

    1. Fully insert a new gasket to the exhaust manifold by hand.

    2. Using a wooden block, uniformly strike the gasket so that the gasket and exhaust manifold are properly fit.

      NOTICE:
      1. Be careful with the installation direction of the gasket.
      2. Do not reuse the gasket.
      3. Do not damage the gasket.
      4. To ensure a proper seal, do not use the exhaust pipe assembly front to force the gasket onto the front exhaust manifold.

  1. Connect the exhaust pipe support, and install the exhaust pipe assembly front with the 4 bolts, 2 compression springs and 2 nuts.

    Torque:
    exhaust manifold side:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }
    exhaust pipe assembly front side:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }

    NOTICE:
    After installation, check that the clearance is almost same at any point between the flanges of the exhaust manifold and exhaust pipe assembly front.


7. INSTALL EXHAUST PIPE ASSEMBLY FRONT (for Super Long Wheelbase)

  1. Inspect the compression spring.

    1. A077857
      Using vernier calipers, measure the free length of the compression springs.

      Minimum length:
      40.5mm(1.594 in.)

      HINT:
      If the free length is less than the minimum, replace the compression spring.

  1. A102062E03
    Install the gasket.

    1. Fully insert a new gasket to the exhaust manifold by hand.

    2. Using a wooden block, uniformly strike the gasket so that the gasket and exhaust manifold are properly fit.

      NOTICE:
      1. Be careful with the installation direction of the gasket.
      2. Do not reuse the gasket.
      3. Do not damage the gasket.
      4. To ensure a proper seal, do not use the exhaust pipe assembly front to force the gasket onto the front exhaust manifold.

  1. Connect the exhaust pipe support, and install the exhaust pipe assembly front and a new gasket with the 4 bolts, 2 compression springs and 2nuts.

    Torque:
    Exhaust manifold side:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }
    Exhaust pipe assembly center side:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }

    NOTICE:
    After installation, check that the clearance is almost same at any point between the flanges of the exhaust manifold and exhaust pipe assembly front .


8. INSTALL TURBO WATER PIPE SUB-ASSEMBLY NO.2 (for Water Cooled Turbocharger)
  1. Install a new gasket onto the turbocharger.

  1. A113047
    Install the turbo water pipe No.2 with the bolt and 2 nuts to the turbocharger.

    Torque:
    Bolt:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }
    Nut:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


9. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY NO.2

  1. Water cooled turbocharger (w/ heater)

    1. Install a new gasket onto the cylinder block.

    2. A113051
      Install the water by-pass pipe No.2 with the bolt and 2 nuts.

      Torque:
      Bolt:
      18 N*m{ 184 kgf*cm , 13 ft.*lbf }
      Nut:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    3. Connect the 2 water hoses with the 2 clips.

    4. Connect the water by-pass hose No.3 with the clip.

    5. Connect the heater water inlet hose with the clip.

  1. Water cooled turbocharger (w/o heater)

    1. Install a new gasket onto the cylinder block.

    2. A113049
      Install the water by-pass pipe No.2 with the 2 nuts.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    3. Install the turbo water pipe No.2 with the 2 bolts.

      Torque:
      18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    4. Connect the 2 water hoses with the 2 clips.

    5. Connect the water by-pass hose No.3 with the clip.

  1. Air cooled turbocharger (w/o heater)

    1. Install a new gasket onto the cylinder block.

    2. A113050
      Install the water by-pass pipe No.2 with the 2 nuts.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


10. INSTALL COMPRESSOR ELBOW STAY

  1. A103545
    Install the compressor elbow stay with the bolt.

    Torque:
    32 N*m{ 326 kgf*cm , 23 ft.*lbf }


11. INSTALL COMPRESSOR OUTLET ELBOW

  1. A113753E01
    Install the compressor outlet elbow with the 2 bolts and 2 clamps.

    Torque:
    Bolt (A):
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }
    Bolt (B):
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }


12. INSTALL AIR CLEANER HOSE ASSEMBLY
  1. Install the air cleaner hose assembly with the clamp.


13. INSTALL AIR TUBE ASSEMBLY
  1. Install the air tube assembly with the 2 clamps and 2 bolts.


14. INSTALL VENTILATION PIPE

  1. A115758
    Install the ventilation pipe with the bolt and clip.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }


15. INSTALL COMPRESSOR BRACKET (w/ Air Conditioning)

  1. A102453E02
    Temporarily install the compressor bracket with the 4 bolts.

    HINT:
    Make sure that the compressor bracket is in contact with the engine block.

  1. Install the compressor bracket by tightening the 4 bolts as shown in the illustration.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


16. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (W/ AIR CONDITIONING)

E104245E01
  1. Provisionally tighten the compressor and magnetic clutch with the 4 bolts.

  1. Tighten the compressor and magnetic clutch with the 4 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Tighten the bolts in the order shown in the illustration to install the compressor and magnetic clutch.


17. INSTALL FAN & GENERATOR V BELT
  1. Rotate the V-ribbed belt tensioner pulley clockwise, and then install the fan and generator V belt.

    NOTICE:
    Make sure that the fan and generator V belt is set properly on each pulley.

  1. Check that the indicator mark of the V-ribbed belt tensioner (Click here).


18. ADD ENGINE COOLANT
  1. Firmly tighten the drain plugs.

  1. Fill the radiator reservoir assembly with engine coolant to the top of the inlet.

    Standard Capacity:
    Item
    Specified Condition
    w/o Heater
    13.2 liters (13.9 US qts, 11.6 Imp. qts)
    w/ Front Heater
    14.2 liters (15.0 US qts, 12.5 Imp. qts)
    w/ Front and Rear Heaters
    16.2 liters (17.1 US qts, 14.3 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    1. Use of improper coolants may damage the engine cooling system.
    2. Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

  1. Loosen the bleeder plug of the outlet housing.

  1. When air is bled and the engine coolant drains out, firmly tighten the bleeder plug.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. A142533
    Add engine coolant up to the B line mark in the radiator reservoir assembly and install the radiator reservoir cap sub-assembly.

  1. Warm up the engine until the thermostat opens.

    1. While the thermostat is open, circulate the engine coolant for several minutes.

      HINT:
      The thermostat open timing can be confirmed by pressing the No. 3 radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. A142532
    After the engine cools down, check that the engine coolant level is between the LOW and FULL level marks.


19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

20. INSTALL BATTERY SERVICE HOLE COVER (W/ SUB BATTERY)

21. CHECK FOR ENGINE COOLANT LEAKS
(Click here)

22. INSTALL FENDER APRON MUDGUARD SEAL RH

23. INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
  1. Install the engine service hole sub cover with the 5 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


24. INSTALL FRONT SEAT ASSEMBLY RH (for Hi-back Seat Type)
  1. Perform the same procedure as above on the opposite side. (Click here)


25. INSTALL FRONT SEAT ASSEMBLY RH (for Low-back Seat Type)
  1. Perform the same procedure as above on the opposite side. (Click here)


26. INSTALL FRONT DOOR SCUFF PLATE RH

27. INSTALL ENGINE UNDER COVER NO.2 (w/ Engine Under Cover No.2)
  1. Install the engine under cover No.2 together with the engine side under cover LH and engine side under cover RH (for Wide Body).

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


28. INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }


29. PERFORM INITIALIZATION
(Click here)
← INSTALLATION (Oct 2014 – Dec 2014)INSPECTION (from Oct 2014) →