2014-2019 Hiace · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built Jan 2015 – Dec 2016

Versions by build date: Jan 2015 – Dec 2016 from Jan 2017


1. REMOVE MANUAL TRANSMISSION ASSEMBLY (for Manual Transmission)
(Click here)

2. REMOVE AUTOMATIC TRANSMISSION ASSEMBLY (for Automatic Transmission)
(Click here)

3. REMOVE CLUTCH COVER ASSEMBLY (for Manual Transmission)

  1. C114267E01
    Put matchmarks on the clutch cover assembly and the flywheel sub-assembly.

  1. Loosen each set bolt one turn at a time until spring tension is released.

  1. Remove the set bolts, and pull off the clutch cover assembly.

    NOTICE:
    Do not drop the clutch disc assembly.


4. REMOVE CLUTCH DISC ASSEMBLY (for Manual Transmission)

NOTICE:
Keep the lining part of the clutch disc assembly, the pressure plate and surface of the flywheel sub-assembly away from oil and foreign matter.


5. REMOVE FLYWHEEL SUB-ASSEMBLY (for Manual Transmission)

  1. A102137E01
    Fix the crankshaft with SST.
    SST
    09213-54015   (91651-60855)
    09330-00021  

  1. A109815E02
    Remove the 10 bolts and flywheel.


6. REMOVE DRIVE PLATE AND RING GEAR SUB-ASSEMBLY (for Automatic Transmission)

  1. A102137E01
    Fix the crankshaft with SST.
    SST
    09213-54015   (91651-60855)
    09330-00021  

  1. A102156E01
    Remove the 10 bolts, spacer RR, drive plate and spacer FR.


7. REMOVE REAR CRANKSHAFT OIL SEAL

  1. A102142E03
    Using a knife, cut through the rear crankshaft oil seal lip.
    Text in Illustration 
    *a
    Protective Tape
    *b
    Cut Position

  1. Using a screwdriver with its tip taped, pry out the rear crankshaft oil seal.

    NOTICE:
    After the removal, check the crankshaft for damage. If it is damaged, smooth the surface with 400-grit sandpaper.

← COMPONENTS (from Jan 2015)REMOVAL (from Jan 2017) →