2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jan 2015 – Mar 2016

Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017


1. INSTALL STARTER ASSEMBLY
  1. for Automatic Transmission:

    1. Install the starter with the bolt and 2 nuts.

      Torque:
      68 N*m{ 693 kgf*cm , 50 ft.*lbf }

  1. for Manual Transmission:

    1. Install the starter with the bolt and nut.

      Torque:
      68 N*m{ 693 kgf*cm , 50 ft.*lbf }

  1. Connect the wire harness to terminal 30 with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Close the terminal cap.

  1. Connect the terminal 50 connector to the starter.

  1. for Wide Body:
    Install the ground cable with the bolt.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }


2. INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET (for Automatic Transmission)

  1. C101783
    Install the No. 1 transmission control cable bracket onto the automatic transmission housing with the 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }


3. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission)

  1. C101771E03
    Secure the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

  1. Install the transmission control cable assembly onto the control shaft lever with the nut.

    Torque:
    15 N*m{ 150 kgf*cm , 11 ft.*lbf }


4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← INSTALLATION (Oct 2014 – Dec 2014)INSTALLATION (Apr 2016 – Dec 2016) →