INSTALLATION
Removal / installation · Vehicles built from Jan 2017
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1.
INSTALL STARTER ASSEMBLY |
 |
- Install the starter with the 2 bolts.
-
Torque:
- 37 N*m{
377 kgf*cm
, 27 ft.*lbf
}
Connect the wire harness to terminal 30 and install the nut.
-
Torque:
- 9.8 N*m{
100 kgf*cm
, 87 in.*lbf
}
Connect the terminal 50 connector to the starter assembly.
- Install the ground cable and wire bracket with the 2 bolts.
-
Torque:
- 25 N*m{
251 kgf*cm
, 18 ft.*lbf
}
| 2.
INSTALL TRANSMISSION CONTROL CABLE BRACKET NO.1 (for Automatic Transmission)
|
 |
- Install the transmission control cable bracket to the automatic transmission assembly with the 2 bolts.
-
Torque:
- 14 N*m{
143 kgf*cm
, 11 ft.*lbf
}
| 3.
INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission)
|
 |
- Install the transmission control cable assembly to the control shaft lever and transmission control bracket No.1 with the nut and a new clip.
-
Torque:
- 15 N*m{
150 kgf*cm
, 11 ft.*lbf
}
| 4.
INSTALL ENGINE SIDE UNDER COVER LH (w/ Engine Side Under Cover LH) |
 |
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}
| 5.
INSTALL ENGINE SIDE UNDER COVER RH (w/ Engine Side Under Cover RH) |
 |
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}
| 6.
INSTALL ENGINE UNDER COVER NO.2 (w/ Engine Under Cover No.2) |
 |
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}
| 7.
CONNECT NEGATIVE BATTERY CABLE |
|
| 8.
PERFORM INITIALIZATION |
 |
Some system need initialization when reconnecting the battery cable. (Click here)