2014-2019 Hiace · Service Manual HEATER & AIR CONDITIONING SYSTEM

INSTALLATION

Removal / installation · Vehicles built from Oct 2014


1. INSTALL V (COOLER COMPRESSOR TO CRANKSHAFT PULLEY) BELT No.1

  1. E107311
    Install the V belt as shown in the illustration.


2. ADJUST V(COOLER COMPRESSOR TO CRANKSHAFT PULLEY) BELT No.1

  1. E107311E03
    Tightening the bolt , adjust the tension of the V belt.

  1. Apply drive belt tension by turning bolt.

    1. Drive belt deflection

      New belt:
      11 to 15 mm (0.43 to 0.59 in.)

      Used belt:
      15 to 20 mm (0.59 to 0.78 in.)

    2. Drive belt tension

      New belt:
      372 to 608 N (38 to 62 kgf)

      Used belt:
      196 to 392 N (20 to 40 kgf)

      NOTICE:
      1. When installing a new belt, readjust the belt tension after 5 minutes of idling so that tension is within the specified range.
      2. When readjusting the belt tension, adjust the belt once again after 5 minutes of idling so that tension is within the specified range.

  1. Apply drive belt tension by turning bolt.

  1. E107311E04
    Tighten nut.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

← REMOVAL (from Oct 2014)ON-VEHICLE INSPECTION (from Oct 2014) →