INSTALLATION
Removal / installation · Vehicles built from Oct 2014
| 1.
INSTALL VACUUM PUMP |
 |
Apply engine oil to 2 new O-rings.
- Install the 2 O-rings and the vacuum pump with the 2 nuts.
-
Torque:
- 21 N*m{
210 kgf*cm
, 15 ft.*lbf
}
- NOTICE:
- Be careful not to drop the O-rings.
- Make sure that the vacuum pump is securely installed.
- Connect the vacuum hose (A) to the vacuum pump union.
Connect the vacuum hose (B) to the vacuum pump union with the clip.
- NOTICE:
- Set the vacuum hose so that the paint mark faces upward.
| 2.
INSTALL TIMING GEAR COVER INSULATOR |
 |
- Install the timing gear cover insulator with the bolt.
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}