INSTALLATION
Removal / installation · Vehicles built from Jan 2017
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1.
INSTALL VENTURI ASSEMBLY |
 |
Install a new gasket and venturi.
- Connect the throttle control motor connector.
- Connect the throttle open switch connector.
| 2.
INSTALL INTAKE AIR CONNECTOR SUB-ASSEMBLY |
 |
- Install a new gasket and intake air connector with the bolt and 3 nuts.
-
Torque:
- bolt:
- 18 N*m{
184 kgf*cm
, 13 ft.*lbf
}
- Nut:
- 12 N*m{
122 kgf*cm
, 9 ft.*lbf
}
Connect the turbo pressure sensor connector.
Connect the ventilation hose.
| 3.
CONNECT AIR CLEANER HOSE NO.2 |
 |
Install the air cleaner hose No.2 with the clamp.
| 4.
REMOVE CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 5.
PERFORM INITIALIZATION |
 |
(Click here)