INSTALLATION
Removal / installation · Vehicles built Apr 2016 – Dec 2016
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1. INSTALL STARTER ASSEMBLY |
Install the starter assembly with the 2 bolts.
- Torque:
- 37 N*m{ 377 kgf*cm , 27 ft.*lbf }
Connect the wire harness with the nut.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
Install the terminal cap.
Connect the starter connector.
Connect the wire harness with the bolt.
- Torque:
- 25 N*m{ 250 kgf*cm , 18 ft.*lbf }
Install the wire harness bracket with the bolt.
- Torque:
- 25 N*m{ 250 kgf*cm , 18 ft.*lbf }
Attach the wire harness clamp to the wire harness bracket.
| 2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
