2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Oct 2014 – Dec 2014

Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017


1. INSTALL STARTER ASSEMBLY
  1. Install the starter assembly with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Connect the wire harness with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.

  1. Connect the starter connector.

  1. Connect the wire harness with the bolt.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

  1. Install the wire harness bracket with the bolt.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

  1. Attach the wire harness clamp to the wire harness bracket.


2. INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET
  1. Install the transmission control cable bracket with the 2 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }


3. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
  1. Connect the transmission control shift cable assembly with a new clip and nut.

    Torque:
    15 N*m{ 148 kgf*cm , 11 ft.*lbf }


4. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY
  1. Coat a new O-ring with ATF, and install it to the transmission oil filler tube sub-assembly.

  1. Install the transmission oil filler tube sub-assembly with the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the oil level dipstick.


5. INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← REASSEMBLY (from Oct 2014)INSTALLATION (Jan 2015 – Mar 2016) →