P2716/77 Pressure Control Solenoid "D" Electrical (Shift Solenoid Valve SLT)
Diagnostic trouble codes · Vehicles built from Jan 2017
Versions by build date: Oct 2014 – Dec 2016 from Jan 2017
DESCRIPTION
Shift solenoid valve SLT controls the transmission line pressure for smooth transmission operation based on signals from the throttle position sensor and vehicle speed sensor.The TCM adjusts the current to shift solenoid valve SLT to control the hydraulic line pressure coming from the primary regulator valve. Appropriate line pressure assures smooth shifting with varying engine outputs.


| DTC No. |
DTC Detection Condition |
Trouble Area |
| P2716/77 |
Open or short is detected in shift solenoid valve SLT circuit for 1 second or more while driving (1-trip detection logic). |
|
MONITOR DESCRIPTION
When an open or short in the shift solenoid valve SLT circuit is detected, the TCM interprets this as a fault.The TCM will turn on the MIL* and store the DTC.
*: for 1KD-FTV w/o Flex Lock Up, 2KD-FTV
WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. INSPECT TRANSMISSION WIRE (SLT) |
Disconnect the transmission wire connector from the transmission.

Measure the resistance according to the value(s) in the table below.
- Resistance:
Tester Connection
Specified Condition
20°C (68°F)
2 (SLT+) - 6 (SLT-)
5.0 to 5.6 Ω
Measure the resistance according to the value(s) in the table below.
- Resistance (Check for short):
Tester Connection
Specified Condition
2 (SLT+) - Body ground
10 kΩ or higher
6 (SLT-) - Body ground
↑
|
|
||||
| OK | |
| 2. CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - TCM) |
Connect the transmission wire connector to the transmission.

Disconnect the TCM connector.
Measure the resistance according to the value(s) in the table below.
- Resistance:
Tester Connection
Specified Condition
20°C (68°F)
O1-20 (SLT+) - O1-19 (SLT-)
5.0 to 5.6 Ω
Measure the resistance according to the value(s) in the table below.
- Resistance (Check for short):
Tester Connection
Specified Condition
O1-20 (SLT+) - Body ground
10 kΩ or higher
O1-19 (SLT-) - Body ground
↑
|
|
||||
| OK | ||
| ||
| 3. INSPECT SHIFT SOLENOID VALVE SLT |
Remove the shift solenoid valve (SLT).

Measure the resistance according to the value(s) in the table below.
- Resistance:
Tester Connection
Specified Condition
20°C (68°F)
1 - 2
5.0 to 5.6 Ω
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the valve.
- OK:
- The solenoid makes an operating sound.
|
|
||||
| OK | ||
| ||
