P0976/63 Shift Solenoid "B" Control Circuit Low (Shift Solenoid Valve S2)
Diagnostic trouble codes · Vehicles built from Oct 2014
Also covers:
- P0977/63 Shift Solenoid "B" Control Circuit High (Shift Solenoid Valve S2)
DESCRIPTION
Shifting from 1st to 4th (O/D) is performed in combination with "ON" and "OFF" operation of the shift solenoid valves S1, S2 and SL which are controlled by the TCM. If an open or short circuit occurs in either of the shift solenoid valves, the TCM controls the remaining normal shift solenoid valves to allow the vehicle to be operated smoothly (Click here).| DTC No. |
DTC Detection Condition |
Trouble Area |
| P0976/63 |
TCM detects short in solenoid valve S2 circuit 2 times when solenoid valve S2 is operated (1-trip detection logic) |
|
| P0977/63 |
TCM detects open in solenoid valve S2 circuit 2 times when solenoid valve S2 is not operated (1-trip detection logic) |
|
MONITOR DESCRIPTION
These DTCs indicate an open or short in the shift solenoid valve S2 circuit. When there is an open or short circuit in any shift solenoid valve circuit, the TCM detects the problem and illuminates the MIL and stores the DTC. When the shift solenoid valve S2 is on, if resistance is 8 Ω or less, the TCM determines there is a short in the shift solenoid valve S2 circuit.When the shift solenoid valve S2 is off, if resistance is 100 kΩ or more, the TCM determines there is an open in the shift solenoid valve S2 circuit (Click here).
WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. INSPECT TRANSMISSION WIRE (S2) |
Disconnect the transmission wire connector from the transmission.

Measure the resistance according to the value(s) in the table below.
- Resistance:
Tester Connection
Specified Condition
20°C (68°F)
8 - Body ground
11 to 15 Ω
|
|
||||
| OK | |
| 2. CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - TCM) |
Connect the transmission connector to the transmission.

Disconnect the connector from the TCM.
Measure the resistance according to the value(s) in the table below.
- Resistance:
Tester Connection
Specified Condition
20°C (68°F)
O1-17 (S2) - Body ground
11 to 15 Ω
|
|
||||
| OK | ||
| ||
| 3. INSPECT SHIFT SOLENOID VALVE S2 |
Remove the shift solenoid valve S2.

Measure the resistance according to the value(s) in the table below.
- Resistance:
Tester Connection
Specified Condition
20°C (68°F)
Solenoid Connector (S2) - Solenoid Body (S2)
11 to 15 Ω
Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
- OK:
- The solenoid makes an operating sound.
|
|
||||
| OK | ||
| ||
