2014-2019 Hiace · Service Manual ENGINE

REASSEMBLY

Removal / installation · Vehicles built from Oct 2014


1. INSTALL GENERATOR ROTOR ASSEMBLY
  1. Using a press, press in the rotor.

  1. Place the washer to the rotor.


2. INSTALL RECTIFIER END FRAME

  1. S003959E02
    Using a 17 mm socket wrench and press, slowly press in the rectifier end frame.

  1. A074011E03
    Install the cord clamp and 4 nuts.

    Torque:
    :
    5.9 N*m{ 60 kgf*cm , 53 in.*lbf }


3. INSTALL GENERATOR HOLDER W/ RECTIFIER

  1. A074013E02
    Install the 4 rubber insulators on the lead wires.

    NOTICE:
    Be careful to install the rubber insulators in the correct direction.

  1. A074014E02
    While pushing down on the rectifier holder, install it with the 4 screws.

    Torque:
    2.9 N*m{ 30 kgf*cm , 26 in.*lbf }


4. INSTALL BRUSH HOLDER AND REGULATOR

  1. A074015E01
    Install the regulator with the 3 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Place the seal plate.

  1. Install the brush holder with the 2 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Place the brush holder cover.


5. INSTALL REAR END COVER

  1. A074016E02
    Install the rear end cover and plate terminal with the bolt and 3 nuts.

    Torque:
    Nut:
    4.4 N*m{ 45 kgf*cm , 39 in.*lbf }
    Bolt:
    3.9 N*m{ 40 kgf*cm , 35 in.*lbf }

  1. Install the terminal insulator with the nut.

    Torque:
    4.1 N*m{ 42 kgf*cm , 36 in.*lbf }

← INSPECTION (from Oct 2014)INSTALLATION (from Oct 2014) →