INSTALLATION
Removal / installation · Vehicles built Apr 2016 – Dec 2016
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1. INSTALL NO. 2 GLOW PLUG CONTROLLER BRACKET |
Install the No. 2 glow plug controller bracket to the glow plug controller with the 2 screws.
- Torque:
- 3.0 N*m{ 31 kgf*cm , 27 in.*lbf }
| 2. INSTALL NO. 1 GLOW PLUG CONTROLLER BRACKET |
Install the No. 1 glow plug controller bracket to the glow plug controller with the 2 screws.
- Torque:
- 3.0 N*m{ 31 kgf*cm , 27 in.*lbf }
| 3. INSTALL GLOW PLUG CONTROLLER |
Install the glow plug controller with the 2 nuts.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Connect the 4 connectors to the glow plug controller.
| 4. INSTALL BATTERY SERVICE HOLE COVER |
| 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
