REASSEMBLY
Removal / installation · Vehicles built from Oct 2014
| 1.
INSTALL NO. 2 EGR VALVE ASSEMBLY |
 |
Temporarily install a new gasket and the No. 2 EGR valve with the 6 bolts to the EGR cooler.
- Using a 6 mm hexagon wrench, tighten the 6 bolts in the order shown in the illustration.
-
Torque:
- 28 N*m{
286 kgf*cm
, 21 ft.*lbf
}
| 2.
INSTALL NO. 2 VACUUM SWITCHING VALVE |
 |
Install the No. 2 vacuum switching valve with the screw.
-
Torque:
- 1.5 N*m{
15 kgf*cm
, 13 in.*lbf
}
| 3.
INSTALL NO. 1 WATER BY-PASS HOSE |
 |
- Install the No. 1 water by-pass hose to the EGR cooler.
- HINT:
- The direction of the hose clamp is indicated in the illustration.