2014-2019 Hiace · Service Manual ENGINE

REASSEMBLY

Removal / installation · Vehicles built from Oct 2014


1. INSTALL NO. 2 EGR VALVE ASSEMBLY
  1. Temporarily install a new gasket and the No. 2 EGR valve with the 6 bolts to the EGR cooler.

  1. A172237E04
    Using a 6 mm hexagon wrench, tighten the 6 bolts in the order shown in the illustration.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }


2. INSTALL NO. 2 VACUUM SWITCHING VALVE
  1. Install the No. 2 vacuum switching valve with the screw.

    Torque:
    1.5 N*m{ 15 kgf*cm , 13 in.*lbf }


3. INSTALL NO. 1 WATER BY-PASS HOSE

  1. A242062E01
    Install the No. 1 water by-pass hose to the EGR cooler.

    HINT:
    The direction of the hose clamp is indicated in the illustration.

← INSPECTION (from Oct 2014)INSTALLATION (from Oct 2014) →