INSTALLATION
Removal / installation · Vehicles built from Oct 2014
| 1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY |
Install the vacuum switching valve with the bolt.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the connector and vacuum hose to the vacuum switching valve.
Attach the clamp and wire harness.
Connect the connector to the electric EGR control valve.
| 2. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY (for Automatic Transmission) |
Coat a new O-ring with ATF and install it onto the oil filler tube sub-assembly.

Install the oil filler tube sub-assembly with the 2 bolts.
- Torque:
- 12 N*m{ 122 kgf*cm , 9 ft.*lbf }
| 3. INSTALL NO. 2 ENGINE SERVICE HOLE COVER (for Standard Body) |
Install the No. 2 engine service hole cover with the 3 bolts.
- Torque:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
Return the carpet to its original position and attach the clips.
