2014-2019 Hiace · Service Manual ENGINE

ON-VEHICLE INSPECTION

Inspection · Vehicles built from Oct 2014


INSPECT NO. 2 INTEGRATION RELAY (HD-LP NO. 1)

  1. Check the HD-LP No. 1 relay.

    1. Remove the H-LP RH-LO fuse.

    2. A320036E01
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      d-2 - 12D-3
      Battery voltage not applied to terminals d-2 and 12D-4
      10 kΩ or higher
      Battery voltage applied to terminals d-2 and 12D-4
      Below 1 Ω

      Text in Illustration 
      *1
      H-LP RH-LO Fuse
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.

    3. Install the H-LP RH-LO fuse.


INSPECT NO. 2 INTEGRATION RELAY (DIM NO. 1)
  1. Check the H-LP RH-HI fuse.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      H-LP RH-HI fuse
      Always
      Below 1 Ω

      If the result is not as specified, replace the H-LP RH-HI fuse.

  1. Check the DIM No. 1 relay.

    1. A318538E03
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      12A-1 - 12C-2
      Battery voltage not applied to terminals 12C-3 and 12C-1
      10 kΩ or higher
      Battery voltage applied to terminals 12C-3 and 12C-1
      Below 1 Ω

      Text in Illustration 
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.


INSPECT NO. 2 INTEGRATION RELAY (HD-LP NO. 2)

  1. Check the HD-LP No. 2 relay.

    1. Remove the H-LP LH-LO fuse.

    2. A320036E05
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      c-2 - 12B-9
      Battery voltage not applied to terminals c-2 and 12B-10
      10 kΩ or higher
      Battery voltage applied to terminals c-2 and 12B-10
      Below 1 Ω

      Text in Illustration 
      *1
      H-LP LH-LO Fuse
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.

    3. Install the H-LP LH-LO fuse.


INSPECT NO. 2 INTEGRATION RELAY (DIM NO. 2)
  1. Check the H-LP LH-HI fuse.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      H-LP LH-HI fuse
      Always
      Below 1 Ω

      If the result is not as specified, replace the H-LP LH-HI fuse.

  1. Check the DIM No. 2 relay.

    1. A318538E04
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      12A-1 - 12B-12
      Battery voltage not applied to terminals 12B-8 and 12B-11
      10 kΩ or higher
      Battery voltage applied to terminals 12B-8 and 12B-11
      Below 1 Ω

      Text in Illustration 
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.


INSPECT NO. 2 INTEGRATION RELAY (IG2)
  1. Check the IG2-MAIN fuse.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      IG2-MAIN fuse
      Always
      Below 1 Ω

      If the result is not as specified, replace the IG2-MAIN fuse.

  1. Check the IG2 relay.

    1. A318538E05
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      12A-1 - 12D-1
      Battery voltage not applied to terminals 12D-2 and 12E-4
      10 kΩ or higher
      Battery voltage applied to terminals 12D-2 and 12E-4
      Below 1 Ω

      Text in Illustration 
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.


INSPECT NO. 2 INTEGRATION RELAY (DRL)
  1. Check the DRL fuse.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      DRL fuse
      Always
      Below 1 Ω

      If the result is not as specified, replace the DRL fuse.

  1. Check the DRL relay.

    1. A318538E05
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      12A-1 - 12D-6
      Battery voltage not applied to terminals 12E-12 and 12D-7
      10 kΩ or higher
      Battery voltage applied to terminals 12E-12 and 12D-7
      Below 1 Ω

      Text in Illustration 
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.


INSPECT NO. 2 INTEGRATION RELAY (ACC)

  1. Check the ACC relay.

    1. A318538E06
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      12E-7 - 12E-9
      Battery voltage not applied to terminals 12E-8 and 12E-4
      10 kΩ or higher
      Battery voltage applied to terminals 12E-8 and 12E-4
      Below 1 Ω

      Text in Illustration 
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.


INSPECT NO. 2 INTEGRATION RELAY (100V)
  1. Check the 100V fuse.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      100V fuse
      Always
      Below 1 Ω

      If the result is not as specified, replace the 100V fuse.

  1. Check the 100V relay.

    1. A318538E07
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      12A-1 - 12E-3
      Battery voltage not applied to terminals 12E-1 and 12E-4
      10 kΩ or higher
      Battery voltage applied to terminals 12E-1 and 12E-4
      Below 1 Ω

      Text in Illustration 
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.


INSPECT NO. 2 INTEGRATION RELAY (FR FOG)

  1. Check the FR FOG relay.

    1. A318538E08
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      12B-3 - 12B-1
      Battery voltage not applied to terminals 12B-6 and 12C-4
      10 kΩ or higher
      Battery voltage applied to terminals 12B-6 and 12C-4
      Below 1 Ω

      Text in Illustration 
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.


INSPECT NO. 2 INTEGRATION RELAY (DOME CUT)

  1. Check the DOME CUT relay.

    1. A318538E09
      Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      12C-7 - 12C-6
      Battery voltage not applied to terminals 12C-8 and 12C-5
      10 kΩ or higher
      Battery voltage applied to terminals 12C-8 and 12C-5
      Below 1 Ω

      Text in Illustration 
      *a
      Component without harness connected
      (No. 2 Integration Relay)
      If the result is not as specified, replace the No. 2 integration relay.

← INSTALLATION (from Oct 2014)PRECAUTION (Oct 2014 – Dec 2014) →