2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Oct 2014


1. INSTALL INTEGRATION NO.1 RELAY
  1. Connect the 3 connectors.

  1. Attach the integration relay to the junction block No.1.

  1. Install the engine room junction block cover.

← INSPECTION (from Oct 2014)ON-VEHICLE INSPECTION (from Oct 2014) →