2014-2019 Hiace · Service Manual ENGINE

REASSEMBLY

Removal / installation · Vehicles built from Jan 2017


1. INSTALL TURBOCHARGER NOZZLE VANE CONTROL ACTUATOR
  1. Install the turbocharger nozzle vane control actuator with the 3 bolts.

    Torque:
    12 N*m{ 125 kgf*cm , 9 ft.*lbf }


2. INSTALL TURBOCHARGER VANE CONTROL ROD SUB-ASSEMBLY
  1. Install the turbocharger vane control rod sub-assembly.

  1. Install the variable nozzle vane motor assembly and turbocharger vane control link sub-assembly with 2 new E-washers.

    NOTICE:
    Do not reuse the E-washer.

← INSPECTION (from Jan 2017)INSTALLATION (from Jan 2017) →