INSTALLATION
Removal / installation · Vehicles built from Jan 2017
| 1.
INSTALL NO. 3 UREA PUMP CONTROL BRACKET |
 |
Install the No. 3 urea pump control bracket to the urea pump control ECU with the 2 bolts.
-
Torque:
- 4.5 N*m{
46 kgf*cm
, 40 in.*lbf
}
| 2.
INSTALL NO. 4 UREA PUMP CONTROL BRACKET |
 |
Attach the 3 claws and install the No. 4 urea pump control bracket to the No. 3 urea pump control bracket.
| 3.
INSTALL NO. 2 UREA PUMP CONTROL BRACKET |
 |
Install the No. 2 urea pump control bracket to the No. 3 urea pump control bracket with the 2 bolts.
-
Torque:
- 4.5 N*m{
46 kgf*cm
, 40 in.*lbf
}
| 4.
INSTALL UREA PUMP CONTROL ECU |
 |
Install the urea pump control ECU to the body with the 2 bolts.
-
Torque:
- 44 N*m{
447 kgf*cm
, 32 ft.*lbf
}
- Connect the connector to the urea pump control ECU.
- NOTICE:
- When connecting a connector, make sure that dirt, water and other foreign matter is not stuck between the connector and urea pump control ECU.
| 5.
INSTALL NO. 1 UREA PUMP CONTROL BRACKET |
 |
Attach the 3 claws and install the No. 1 urea pump control bracket to the No. 3 urea pump control bracket and No. 4 urea pump control bracket.
| 6.
INSTALL RADIATOR ASSEMBLY |
 |
(Click here)