Home › Power Source / Network › 1GD-FTV (BATTERY / CHARGING) › BATTERY CURRENT SENSOR
RM35X0E _57 Power Source / Network _078663 1GD-FTV BATTERY / CHARGING _0386530 BATTERY CURRENT SENSOR A

1GD-FTV BATTERY / CHARGING  BATTERY CURRENT SENSOR  INSTALLATION  


PROCEDURE

Hide 28850C 1.INSTALL BATTERY STATE SENSOR ASSEMBLY

a.

Connect the battery state sensor assembly connector to the battery state sensor assembly.


b.

Install the battery state sensor assembly to the battery and tighten the nut.

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)


c.

Connect the engine wire to the battery state sensor assembly with the nut.

Torque:
7.6 N*m (77 kgf*cm, 67 in.*lbf)


Hide 58408F 2.INSTALL BATTERY SERVICE HOLE COVER

a.

Install the battery service hole cover sub-assembly LH to the vehicle with the 5 bolts.

Torque:
13.5 N*m (138 kgf*cm, 10 ft.*lbf)


Hide 67914B 3.INSTALL FRONT DOOR SCUFF PLATE LH

a.

Attach the 2 claws and install the front door scuff plate LH with the 6 bolts.


Hide 67912A 4.INSTALL FRONT DOOR OUTSIDE SCUFF PLATE LH

a.

Install the 2 front door outside scuff plate LH to the front door scuff plate LH.


Hide 5. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART