Home › Steering › POWER ASSIST SYSTEMS › VANE PUMP (for 7GR-FKS(w/ Variable Flow Control Solenoid Valve)) › 2019.02–2019.06
RM35X0E _55 Steering _078944 POWER ASSIST SYSTEMS _0388796 VANE PUMP(for 7GR-FKS(w/ Variable Flow Control Solenoid Valve)) A

POWER ASSIST SYSTEMS  VANE PUMP(for 7GR-FKS(w/ Variable Flow Control Solenoid Valve))  INSTALLATION  


PROCEDURE

Hide 44310 1.INSTALL VANE PUMP ASSEMBLY

a.

Install the vane pump with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 44410 2.CONNECT PRESSURE FEED TUBE ASSEMBLY

a.

Install a new gasket to the pressure feed tube assembly.


b.

Connect the pressure feed tube assembly and install the union bolt.

Torque:
50 N*m (510 kgf*cm, 37 ft.*lbf)


Hide 44348D 3.CONNECT NO. 2 OIL RESERVOIR TO PUMP HOSE

a.

Connect the No. 2 oil reservoir to pump hose to the vane pump assembly and slide the clamp to secure it.


Hide 4.CONNECT WIRE HARNESS BRACKET

a.

Connect the 2 connectors.


b.

Install the wire harness bracket with the bolt.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


Hide 16361A 5.INSTALL FAN AND GENERATOR V BELT

Hide 6.INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Hide 17751 7.INSTALL NO. 1 AIR CLEANER INLET

Hide 11209 8.INSTALL V-BANK COVER SUB-ASSEMBLY (w/ Cover)

Hide 53106B 9.INSTALL RADIATOR COVER SUB-ASSEMBLY

Hide 10.INSTALL FRONT WHEEL RH

Hide 11.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 12. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART


Hide 13.ADD POWER STEERING FLUID

Hide 15.INSPECT FOR POWER STEERING FLUID LEAK