After replacing the exhaust manifold converter sub-assembly (DPF catalyst), clear the thermal deterioration data stored in the ECM.
Connect the GTS to the DLC3.
Start the engine and turn the GTS on.
Enter the following menus: Powertrain / Engine and Transmission / Data List / Diesel Exhaust.
Take a snapshot of the following Data List items.
A snapshot can be used to compare vehicle data from the time of the malfunction to normal data and is very useful for troubleshooting. The data in the list below is that of a normal vehicle, but as the data varies between individual vehicles, this data should only be used for reference.
Check the Data List at idling and at 4000 rpm with no load after the engine is warmed up.
| Proceed to |
|---|
| NEXT |
NEXT
Check Catalyst Differential Pressure Bank 1 in the snapshot taken in procedure 1 when the engine was running at 4000 rpm with no load.
| Result | Proceed to |
|---|---|
| Catalyst Differential Pressure Bank 1 is more than 0.27 | A |
| Except above | B |
A
B
Replace the exhaust manifold converter sub-assembly.
Click hereEngine / Hybrid System>1GD-FTV (EMISSION CONTROL)>MONOLITHIC CONVERTER (w/ DPF)>REMOVAL
| Proceed to |
|---|
| NEXT |
NEXT
Connect the GTS to the DLC3.
Turn the engine switch on (IG) and turn the GTS on.
Enter the following menus: Powertrain / Engine and Transmission / Utility / Catalyst Deterioration Learning Value Clear.
| Tester Display |
|---|
| Catalyst Deterioration Learning Value Clear |
Press "Next".
Press "Exit".
Enter the menu options in this order: Powertrain / Engine and Transmission / Utility / DPF Deposition Value Clear.
| Tester Display |
|---|
| DPF Deposition Value Clear |
Press "Next".
Press "Exit".
| Proceed to |
|---|
| NEXT |
NEXT
Turn the engine switch on (IG).
Turn the engine switch off and wait for 30 seconds or more.
Turn the engine switch on (IG) and wait for 10 seconds or more.
Connect the GTS to the DLC3.
Start the engine and warm it up until the engine coolant temperature reaches 75°C (167°F) or higher.
Maintain the maximum possible engine speed under no load for 10 seconds to blow out all soot from inside the exhaust pipe.
If only a low engine speed is continuously maintained, soot may accumulate at the end of the catalyst.
When soot accumulates at the end of the catalyst, it may not be possible to perform PM forced regeneration control normally.
Enter the following menus: Powertrain / Engine and Transmission / Utility / PM Regenerate Mode
| Tester Display |
|---|
| PM Regenerate Mode |
Enter PM Regenerate Mode.
Be careful of the exhaust pipes and surrounding areas, as they become extremely hot when performing PM forced regeneration.
After 10 minutes have passed with the Coolant Temperature at 80°C (176°F) or higher during PM regeneration, check the value of Exhaust Temperature B1S2.
| Tester Display |
|---|
| Coolant Temperature |
| Exhaust Temperature B1S2 |
PM forced regeneration takes 15 to 40 minutes to finish.
The time it takes to complete PM forced regeneration changes depending on "PM Accumulation Ratio Bank 1" and the vehicle operating conditions.
If the value of "Catalyst Differential Pressure Bank 1" increases too much during the PM forced regeneration, the failsafe function activates and PM forced regeneration is stopped.
Perform PM forced regeneration control until the display on the multi-information display turns off.
If actions such as depressing the accelerator pedal or operating the DPF switch, etc. are performed during PM forced regeneration, PM forced regeneration stops. If PM forced regeneration stops, it is necessary to perform it again.
PM forced regeneration control is not complete until the display on the multi-information display turns off.
| Result | Proceed to |
|---|---|
| Exhaust Temperature B1S2 does not reach 500°C (932°F)* | A |
| Exhaust Temperature B1S2 reaches 500°C (932°F) or higher | B |
*: If Exhaust Temperature B1S2 is not 500°C (932°F) or more, the exhaust fuel addition injector assembly may be blocked by accumulated deposits in the No. 1 injector holder.
B
A
Click hereEngine / Hybrid System>1GD-FTV (EMISSION CONTROL)>EXHAUST FUEL ADDITION INJECTOR>REMOVAL
If there is no malfunction in the electrical system, Exhaust Temperature B1S2 is 500°C (932°F) or less even though fuel is injected, and white smoke is not emitted, replace the exhaust fuel addition injector assembly together with the No. 1 injector holder.