44310
1.INSTALL VANE PUMP ASSEMBLY
Install the vane pump with the 2 bolts.
44410
2.CONNECT PRESSURE FEED TUBE ASSEMBLY
Install a new gasket to the pressure feed tube assembly.
Connect the pressure feed tube assembly and install the union bolt.
44348D
3.CONNECT NO. 2 OIL RESERVOIR TO PUMP HOSE
Connect the No. 2 oil reservoir to pump hose to the vane pump assembly and slide the clamp to secure it.
4.CONNECT WIRE HARNESS BRACKET
Connect the 2 connectors.
Install the wire harness bracket with the bolt.
16361A
5.INSTALL FAN AND GENERATOR V BELT
6.INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
17751
7.INSTALL NO. 1 AIR CLEANER INLET
11209
8.INSTALL V-BANK COVER SUB-ASSEMBLY (w/ Cover)
53106B
9.INSTALL RADIATOR COVER SUB-ASSEMBLY
for Wagon:
Click hereVehicle Exterior>EXTERIOR PANELS / TRIM>RADIATOR GRILLE (for Wagon)>INSTALLATION
except Wagon:
Click hereVehicle Exterior>EXTERIOR PANELS / TRIM>RADIATOR GRILLE (except Wagon)>INSTALLATION
10.INSTALL FRONT WHEEL RH
11.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
12. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART
13.ADD POWER STEERING FLUID
14.BLEED POWER STEERING FLUID
15.INSPECT FOR POWER STEERING FLUID LEAK