While the engine is being cranked, the starter signal is also sent to terminal STA of the ECM. The starter signal mainly performs engine control when the engine is started.
Refer to DTC P061512
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ Urea SCR System)>P061512
Inspect the fuses for circuits related to this system before performing the following procedure.
After replacing the ECM, the new ECM needs registration (Click here Engine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ Urea SCR System)>REGISTRATION) and initialization (Click here Engine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ Urea SCR System)>INITIALIZATION).
This procedure is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to the problem symptoms table.
Connect the GTS to DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Engine / Data List / Primary / Starter SW.
| Tester Display |
|---|
| Starter SW |
Check the value displayed on the GTS when the ignition switch is turned to the ON and START positions.
| Ignition Switch Position | Starter SW |
|---|---|
| ON | OFF |
| START | ON |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the ECM connector.
Disconnect the park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| N2-22 (STA) - E92-5 (L) | Always | Below 1 Ω |
| N2-22 (STA) or E92-5 (L) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG