2007-2013 Highlander Kluger · Service Manual STEERING

INSPECTION

Inspection · Vehicles built from May 2007


INSPECT TIE ROD ASSEMBLY LH

  1. C132329
    Secure the tie rod assembly LH in a vise.

  1. Install the nut to the stud bolt.

  1. Flip the ball joint back and forth 5 times.

  1. Set a torque wrench to the nut, turn the ball joint continuously at a rate of 3 to 5 seconds per turn, and check the turning torque on the 5th turn.

    Standard turning torque:
    0.49 to 3.43 N*m (5.0 to 35.0 kgf*cm, 4.3 to 30.3 in.*lbf)

    HINT:
    If the turning torque is not within the specified range, replace the tie rod assembly LH.


INSPECT TIE ROD ASSEMBLY RH

HINT:
Perform the same procedure as for the LH side.


INSPECT TOTAL PRELOAD

  1. C166344E01
    Using SST, secure the steering link assembly in a vise.
    SST
    09612-00012  

    HINT:
    Tape SST before use.

  1. C166345E01
    Using SST and a torque wrench, inspect the total preload.
    SST
    09616-00011  

    Standard preload:
    0.9 to 1.5 N*m (9.2 to 15.3 kgf*cm, 8.0 to 13.3 in.*lbf)

    NOTICE:
    Inspect the total preload around the steering rack center position.

    HINT:
    If the total preload is not within the specified range, replace the steering gear assembly with a new one.

← DISASSEMBLY (from Jul 2010)REASSEMBLY (from Jul 2010) →