INSTALLATION
Removal / installation · Vehicles built Aug 2008 – Jun 2010
Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010
| 1.
INSTALL ENGINE COOLANT TEMPERATURE SENSOR |
 |
- Using a 19 mm deep socket wrench, install the engine coolant temperature sensor and a new gasket.
-
Torque:
- 20 N*m{
200 kgf*cm
, 14 ft.*lbf
}
| 2.
INSTALL KNOCK CONTROL SENSOR
|
 |
- Install the 2 knock control sensors with the 2 bolts as shown in the illustration.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
Connect the 2 knock control sensor connectors.
| 3.
INSTALL KNOCK CONTROL SENSOR WIRE |
 |
- Connect the 2 knock control sensor connectors and 3 clamps.
| 4.
INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY |
 |
- Clean the threads of the oil pressure switch. Apply adhesive to 2 or 3 threads of the oil pressure switch assembly.
- Adhesive:
- Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
- Using a 24 mm deep socket wrench, install the oil pressure switch.
-
Torque:
- 15 N*m{
153 kgf*cm
, 11 ft.*lbf
}
- NOTICE:
- Do not start the engine within 1 hour after installation to prevent oil leaks.
| 5.
INSTALL NO. 1 VACUUM SWITCHING VALVE |
 |
- Install the bolt and No. 1 vacuum switching valve.
-
Torque:
- 10 N*m{
102 kgf*cm
, 7 ft.*lbf
}
| 6.
INSTALL RADIO SETTING CONDENSER |
 |
- Install the 2 bolts and 2 radio setting condensers.
-
Torque:
- 10 N*m{
102 kgf*cm
, 7 ft.*lbf
}
| 7.
INSTALL WATER PUMP PULLEY
|
 |
- Temporarily install the water pump pulley with the 4 bolts.
Using SST, hold the water pump pulley.
- SST
- 09960-10010
(09962-01000, 09963-00700)
Tighten the 4 bolts.
-
Torque:
- 21 N*m{
214 kgf*cm
, 16 ft.*lbf
}
| 8.
INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY |
 |
- Install the No. 2 idler pulley sub-assembly and cover plate with the bolt.
-
Torque:
- 43 N*m{
438 kgf*cm
, 32 ft.*lbf
}
| 9.
INSTALL NO. 2 TIMING GEAR COVER |
 |
- Install the No. 2 timing gear cover with the 2 bolts.
-
Torque:
- 6.0 N*m{
61 kgf*cm
, 53 in.*lbf
}
| 10.
INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
 |
- Temporarily install the V-ribbed belt tensioner assembly with the 5 bolts.
- HINT:
- Each bolt length is as follows:
- A: 70 mm (2.76 in.)
- B: 33 mm (1.30 in.)
Install the V-ribbed belt tensioner assembly by tightening the bolt 1 and bolt 2 in the order shown in the illustration.
-
Torque:
- 43 N*m{
438 kgf*cm
, 32 ft.*lbf
}
Tighten the other bolts.
-
Torque:
- 43 N*m{
438 kgf*cm
, 32 ft.*lbf
}
| 11.
INSTALL GENERATOR ASSEMBLY
|
 |
- Install the wire harness clamp bracket with the bolt.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
- Connect the generator bracket with the wire harness clamp.
- Install generator assembly with the 2 bolts.
-
Torque:
- 43 N*m{
438 kgf*cm
, 32 ft.*lbf
}
- Temporarily install the 2 bolts.
- Fully tighten the 2bolts.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
- Connect the generator connector to the generator assembly.
Install the generator wire with the nut.
-
Torque:
- 9.8 N*m{
100 kgf*cm
, 87 in.*lbf
}
Install the terminal cap.
Connect the 3 wire harness clamps.
Connect the magnetic clutch connector to the compressor and magnetic clutch.
| 12.
INSTALL TRANSVERSE ENGINE MOUNTING BRACKET (for 4WD) |
 |
- Install the transverse engine mounting bracket with the 3 bolts.
-
Torque:
- 64 N*m{
650 kgf*cm
, 47 ft.*lbf
}
| 13.
INSTALL TRANSVERSE ENGINE MOUNTING BRACKET (for 2WD) |
 |
- Install the transverse engine mounting bracket with the 3 bolts.
-
Torque:
- 64 N*m{
650 kgf*cm
, 47 ft.*lbf
}
| 14.
INSTALL TRANSVERSE ENGINE MOUNTING BRACKET |
 |
- Install the engine mounting bracket RH with the 3 bolts.
-
Torque:
- 54 N*m{
551 kgf*cm
, 40 ft.*lbf
}
| 15.
INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH |
 |
- Install a new gasket as shown in the illustration.
- Install the exhaust manifold sub-assembly LH with the 6 nuts in the order shown in the illustration.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
| 16.
INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR |
 |
- Install the No. 2 exhaust manifold heat insulator with the 3 bolts.
-
Torque:
- 8.5 N*m{
87 kgf*cm
, 75 in.*lbf
}
| 17.
INSTALL NO. 2 MANIFOLD STAY |
 |
- Install the No. 2 manifold stay with the bolt and nut in the order shown in the illustration.
-
Torque:
- 34 N*m{
347 kgf*cm
, 25 ft.*lbf
}
| 18.
INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE |
 |
- Install a new O-ring to the No. 2 engine oil level dipstick guide.
Apply a light coat of engine oil to the O-rings.
Push in the No. 2 engine oil level dipstick guide end into the No. 1 engine oil level dipstick guide.
- Install the No. 2 engine oil level dipstick guide with the bolt.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
Install the engine oil level dipstick.
| 19.
INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH |
 |
- Install a new gasket as shown in the illustration.
- Install the exhaust manifold sub-assembly RH with the 6 nuts in the order shown in the illustration.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
| 20.
INSTALL INTAKE MANIFOLD |
 |
- NOTICE:
- DO NOT apply oil to the bolts listed below:
Tightening Parts
|
Intake Manifold and Cylinder Head Sub-assembly RH
|
Intake Manifold and Cylinder Head Sub-assembly LH
|
- Set a new gasket on each cylinder head.
- NOTICE:
- Align the port holes of the gasket and cylinder head.
- Make sure that the gasket is installed in the correct direction.
Set the intake manifold on the cylinder heads.
Install and tighten the 6 bolts and 4 nuts uniformly in several steps.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
| 21.
INSTALL NO. 2 ENGINE MOUNTING STAY RH |
 |
- Install the No. 2 mounting stay RH with the bolt.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
| 22.
INSTALL IGNITION COIL ASSEMBLY (for LHD)
|
 |
- Install the 6 ignition coils with the 6 bolts.
-
Torque:
- 10 N*m{
102 kgf*cm
, 7 ft.*lbf
}
Connect the 6 ignition coil connectors.
- Install the 4 bolts [A].
-
Torque:
- 8.3 N*m{
84 kgf*cm
, 73 in.*lbf
}
Install the nut [B].
-
Torque:
- 8.3 N*m{
84 kgf*cm
, 73 in.*lbf
}
Install the 2 clamps [C].
| 23.
INSTALL IGNITION COIL ASSEMBLY (for RHD)
|
 |
- Install the 6 ignition coils with the 6 bolts.
-
Torque:
- 10 N*m{
102 kgf*cm
, 7 ft.*lbf
}
Connect the 6 ignition coil connectors.
- Install the 2 bolts [D].
-
Torque:
- 8.3 N*m{
84 kgf*cm
, 73 in.*lbf
}
Install the nut [E].
-
Torque:
- 8.3 N*m{
84 kgf*cm
, 73 in.*lbf
}
Install the 2 clamps [F].
| 24.
INSTALL ENGINE HANGERS |
 |
Install the 2 engine hangers with the 4 bolts as shown in the illustration.
- Part No.:
- No. 1 Engine hanger 12281-31120
No. 2 Engine hanger 12282-31100
Bolts 91671-10825
-
Torque:
- 33 N*m{
337 kgf*cm
, 24 ft.*lbf
}
Attach the engine sling device and hang the engine with the chain block.