2007-2013 Highlander Kluger · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jul 2010

Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010


1. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY

  1. A085603E04
    Apply adhesive to 2 or 3 threads of the oil pressure switch assembly.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

  1. A170011
    Using a 24 mm deep socket wrench, install the oil pressure switch assembly.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

    NOTICE:
    Do not start the engine for at least 1 hour after installation.

  1. Connect the oil pressure switch assembly connector.

  1. A170012E01
    Connect the wiring harness protector.


2. INSPECT FOR OIL LEAK
  1. Start the engine.

  1. Check for engine oil leaks from the oil pressure switch assembly.


3. INSTALL FRONT FENDER APRON SEAL RH

  1. A171853
    Install the front fender apron seal RH with the 2 bolts and clip.


4. INSTALL FRONT WHEEL RH (for 4WD)

Torque:
103 N*m{ 1050 kgf*cm , 76 ft.*lbf }

← INSTALLATION (Aug 2008 – Jun 2010)COMPONENTS (May 2007 – Jun 2010) →