Home › ENGINE › 3MZ-FE COOLING › THERMOSTAT

THERMOSTAT > INSTALLATION

for Preparation Click here



1. INSTALL THERMOSTAT


    A080298E01
  1. Install a new gasket to the thermostat.

  1. Align the jiggle valve of the thermostat and water inlet, and insert the thermostat in the water inlet housing.

    HINT:
    The jiggle valve should be set within +/-15° from the prescribed position.



2. INSTALL WATER INLET


    A080824
  1. Install the water inlet with the 3 nuts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the wire harness clamp.



3. INSTALL WATER INLET PIPE


    A080823
  1. Install a new O-ring to the water inlet pipe.

  1. Apply soapy water to the O-ring.

  1. Connect the water inlet pipe to the water inlet.

  1. Install the water inlet pipe to the cylinder head with the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



4. INSTALL INVERTER WITH CONVERTER ASSEMBLY

HINT:
Click here