Home › BODY ELECTRICAL › METER › METER / GAUGE SYSTEM

METER / GAUGE SYSTEM > Clock Display Circuit

for Preparation Click here


DESCRIPTION

The clock assembly uses this circuit to communicate with combination meter assembly via the direct line. The clock assembly uses this circuit to receive the DISP switch signal from the combination meter assembly via the direct line and multi-information display signal from each ECU through the combination meter assembly via the direct line.

HINT:
Each ECU outputs DTCs when a system has a malfunction.


WIRING DIAGRAM


E152377E03


INSPECTION PROCEDURE

1.CHECK CAN COMMUNICATION SYSTEM
  1. Check if CAN communication DTC is output (Click here).

    Result:

    Result
    Proceed to
    CAN communication DTC is not output.
    A
    CAN communication DTC is output.
    B



B
GO TO CAN COMMUNICATION SYSTEM (Click here)
A


2.CHECK HARNESS AND CONNECTOR (CLOCK ASSEMBLY - COMBINATION METER)


    E152378E08
  1. Disconnect the E11 and E1 connectors.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    E11-3 (HSI+) - E1-17 (LCL-)
    Always
    Below 1 Ω
    E11-10 (DATA) - E1-37 (MDAT)
    Always
    Below 1 Ω
    E11-11 (SYNC) - E1-38 (SYNC)
    Always
    Below 1 Ω
    E11-3 (HSI+) - Body ground
    Always
    10 kΩ or higher
    E11-10 (DATA) - Body ground
    Always
    10 kΩ or higher
    E11-11 (SYNC) - Body ground
    Always
    10 kΩ or higher
    E11-16 (SGND) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


3.INSPECT COMBINATION METER ASSEMBLY


    E146936E13
  1. Reconnect the E1 combination meter connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    E11-3 (HSI+) - Body ground
    Power switch on (READY)
    Pulse generation
    E11-10 (DATA) - Body ground
    Power switch on (READY)
    Pulse generation
    E11-11 (SYNC) - Body ground
    Power switch on (READY)
    4 to 6 V



NG
REPLACE COMBINATION METER ASSEMBLY
OK

REPLACE CLOCK ASSEMBLY