Home › Engine / Hybrid System › 2GR-FE EMISSION CONTROL › PURGE VALVE › 2013.12–2016.11
RM3160E _51 Engine / Hybrid System _019665 2GR-FE EMISSION CONTROL _0104498 PURGE VALVE A

2GR-FE EMISSION CONTROL  PURGE VALVE  INSTALLATION  


PROCEDURE

Hide 25860A 1.INSTALL PURGE VALVE (PURGE VSV)

a.

Install the purge valve (purge VSV) to the cylinder head cover sub-assembly LH with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.
A320227C01
1.49,4.292 1.76,4.292 1.76,4.292 1.76,3.813 false 2.615,1.75 2.427,1.75 2.427,1.75 2.135,1.396 true 1.302,0.313 1.531,0.313 1.531,0.313 1.75,0.938 true 1.104,0.229 1.323,0.438 0.219,0.208 10 true *1 2.615,1.635 2.844,1.823 0.229,0.188 10 true *2 1.917,3.302 2.229,3.458 0.313,0.156 10 false *a 1.979,3.604 2.292,3.76 0.313,0.156 10 false *b 2.875,3.719 3.188,3.875 0.313,0.156 10 false *c 1.281,4.219 1.594,4.375 0.313,0.156 10 false *d
*1 Fuel Vapor Feed Hose Assembly
*2 No. 1 Fuel Vapor Feed Hose
*a 2 to 7 mm (0.0787 to 0.276 in.)
*b 120°
*c RH
*d Paint Mark


Connect the No. 1 fuel vapor feed hose to the purge valve (purge VSV).


c.

Connect the fuel vapor feed hose assembly to the purge valve (purge VSV) and slide the clip to secure it.

HINT:

Engage the clip within the area shown in the illustration.



d.

Engage the wire harness clamp to the purge valve (purge VSV).


e.

Connect the purge valve (purge VSV) connector.


Hide 11209 2.INSTALL V-BANK COVER SUB-ASSEMBLY