Home › Engine / Hybrid System › 2GR-FKS (ENGINE CONTROL) › ECM › from 2016.11
RM3160E _51 Engine / Hybrid System _060156 2GR-FKS ENGINE CONTROL _0303254 ECM A

2GR-FKS ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89668 1.INSTALL NO. 2 ECM BRACKET

a.

Install the No. 2 ECM bracket to the ECM with the 2 screws.

Torque:
4.5 N*m (46 kgf*cm, 40 in.*lbf)


Hide 89667 2.INSTALL ECM BRACKET

a.

Install the ECM bracket to the ECM with the 2 screws.

Torque:
4.5 N*m (46 kgf*cm, 40 in.*lbf)


Hide 89661 3.INSTALL ECM

a.

Install the ECM with the 3 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)

NOTICE:

If the ECM has been struck or dropped, replace it.



b.

Engage the clamp to install the wire harness.


c.
A394311

Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
·

When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.

·

Be sure to securely connect the ECM connectors.




Hide 4.INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Hide 17750A 5.INSTALL INLET AIR CLEANER ASSEMBLY

Hide 53295E 6.INSTALL COOL AIR INTAKE DUCT SEAL

Hide 53298E 7.INSTALL RADIATOR SIDE SEAL RH

Hide 53299D 8.INSTALL RADIATOR SIDE DEFLECTOR SEAL LH

Hide 9.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION