Home › ENGINE ยท 2KD-FTV › ENGINE MECHANICAL › ENGINE ASSEMBLY

ENGINE ASSEMBLY > INSTALLATION

for Preparation Click here


NOTICE:
  1. When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
  2. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.



1. INSTALL NO. 1 FRONT ENGINE MOUNTING BRACKET LH


    A098936E01
  1. Install the mounting bracket with the 4 bolts.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }



2. INSTALL NO. 1 FRONT ENGINE MOUNTING BRACKET RH
  1. Install the mounting bracket with the 4 bolts.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }



    A148168
  1. Install the No. 2 cylinder block insulator with the bolt.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }



3. INSTALL ENGINE COOLANT TEMPERATURE SENSOR
  1. Using a 17 mm deep socket wrench, install the sensor.

    Torque:
    20 N*m{ 200 kgf*cm , 14 ft.*lbf }



4. INSTALL CAMSHAFT POSITION SENSOR
  1. Apply clean engine oil to a new O-ring.

  1. Install the sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }



5. INSTALL CRANKSHAFT POSITION SENSOR
  1. Apply clean engine oil to a new O-ring.

  1. Install the sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }



6. INSTALL VANE PUMP ASSEMBLY


A098935E01
  1. Install a new O-ring to the vane pump.

  1. Install the vane pump with the 2 nuts.

    Torque:
    41 N*m{ 418 kgf*cm , 30 ft.*lbf }



7. INSTALL VACUUM PUMP ASSEMBLY


A098930E01
  1. Install 2 new O-rings to the vacuum pump.

  1. Install the vacuum pump with the 2 nuts.

    Torque:
    21 N*m{ 210 kgf*cm , 15 ft.*lbf }



8. INSTALL TIMING GEAR COVER INSULATOR (w/ EGR Cooler)


    A148171
  1. Install the gear cover insulator with the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



9. INSTALL OIL COOLER COVER SUB-ASSEMBLY


A038741E01
  1. Install a new gasket and the oil cooler cover with the 13 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Connect the oil pressure connector and install the wire harness.



10. INSTALL COMMON RAIL ASSEMBLY

NOTICE:
When replacing the common rail, do not remove the foreign object mixing prevention caps of the common rail until just before the fuel inlet pipe and injection pipe are connected to the common rail.



    A098899E01
  1. Install the common rail with the 2 bolts.

    Torque:
    38 N*m{ 387 kgf*cm , 28 ft.*lbf }

  1. Connect the fuel pressure sensor connector.



11. INSTALL FUEL SUPPLY PUMP ASSEMBLY


A070715E01
  1. Check that the supply pump gear in the timing gear case moves back and forth smoothly.

  1. Install a new O-ring to the pump.

  1. Apply a light coat of engine oil to the O-ring.



    A060835E01
  1. Align the set key on the drive shaft with the groove of the injection gear.



    A098897E01
  1. Install the pump with the 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Set a new O-ring before tightening the set nut.



    A070711E01
  1. Using SST, hold the crankshaft pulley and install the set nut.

    SST
    09213-58013  
    09330-00021  

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }



    A071144E01
  1. Move the pump drive shaft pulley back and forth to check the thrust clearance of the injection pump drive shaft.

    Thrust clearance:
    0.15 to 0.55 mm (0.0059 to 0.0217 in.)

    If the clearance is not within the specified range, disassemble and reassemble the supply pump and pump drive shaft pulley. Then repeat step above.



    A098896E01
  1. Connect the 2 connectors.



    A098895E01
  1. Connect the 2 fuel hoses.



    A098974E08
  1. Temporarily install the fuel inlet pipe with the union nuts.

    NOTICE:
    1. If the supply pump is replaced, the fuel inlet pipe must be replaced.
    2. Keep the fuel inlet pipe free of foreign matter.

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nut on the supply pump side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).

  1. Install the oil level gauge guide with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



    G036615E01
  1. Install the clamp with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



12. INSTALL INTAKE MANIFOLD (w/ EGR Cooler)
  1. Install the intake manifold (Click here).



13. INSTALL INTAKE MANIFOLD (w/o EGR Cooler)


A131656E01
  1. Install a new gasket and the manifold to the cylinder head with the 4 bolts and 2 nuts in the order shown in the illustration.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }



14. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY (w/o EGR Cooler)


A098898E01
  1. Temporarily install the leakage pipe with the 3 bolts.

  1. Temporarily install a new gasket with the check valve.

  1. Fully tighten the 3 bolts and check valve.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf } for check valve
    13 N*m{ 133 kgf*cm , 10 ft.*lbf } for bolt

  1. Connect the 2 fuel hoses.



15. INSTALL INJECTION PIPE (w/o EGR Cooler)


G038585E02

NOTICE:
  1. When replacing the injector, also replace the injection pipe.
  2. Keep the joints of the injection pipe clean.

  1. Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.

  1. Install the No. 2 and No. 3 injection pipe clamps with the bolt and 2 nuts, as shown in the illustration.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    HINT:
    If the painted mark on the No. 1 injection pipe has disappeared, use the illustration as a reference to install the clamps.



    A098972E05
  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).



    A098893E01
  1. Temporarily install the No. 4 injection pipe with the union nuts.

  1. Install 2 new injection pipe clamps with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    NOTICE:
    1. Make sure that the inner-rubbers of the injection pipe fit inside the clamps.
    2. When installing the pipe, check that the inner-rubbers and the clamps are in their proper positions.



    A098973E05
  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).



16. INSTALL OIL FILTER SUB-ASSEMBLY
  1. Check and clean the oil filter installation surface.

  1. Apply clean engine oil to the gasket of a new oil filter.

  1. Lightly screw the oil filter into place by hand. Tighten it until the gasket contacts the seat.



    A060101E01
  1. Using SST, tighten the oil filter. Depending on the work space available, choose from the following.

    SST
    09228-07501  

    1. If enough space is available, use a torque wrench to tighten the oil filter.

      Torque:
      12 N*m{ 122 kgf*cm , 9 ft.*lbf }

    2. If enough space is not available to use a torque wrench, tighten the oil filter 3/4 turn by hand or with a common wrench.



17. INSTALL MANIFOLD STAY (w/o EGR Cooler)


    A099932E01
  1. Install the stay with the 2 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

    HINT:
    The stay's indented area (labeled A) must face the manifold.



18. INSTALL GLOW PLUG ASSEMBLY
  1. w/ EGR Cooler:
    Install the glow plug (Click here).

  1. w/ EGR System:
    Install the glow plug (Click here).

  1. w/o EGR System:
    Install the glow plug (Click here).



19. INSTALL WATER OUTLET


    A098977E01
  1. Install a new gasket to the cylinder head, as shown in the illustration.



    A149947E01
  1. Install the water outlet with the 2 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }



20. INSTALL THERMOSTAT


    A110388E01
  1. Install a new gasket to the thermostat.

    HINT:
    When installing the thermostat to the gasket, be careful not to deform the gasket. Make sure that the thermostat is properly installed into the groove of the gasket, as shown in the illustration.

  1. Insert the thermostat into the cylinder block with the jiggle valve facing straight upward.

    HINT:
    The jiggle valve may be set within 30°of either side of the prescribed position.



21. INSTALL WATER INLET


    A097637E01
  1. Install the water inlet with the 3 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



22. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY (for Cold Area Specification Vehicles)
  1. Install the bracket with the 2 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }



23. INSTALL VISCOUS HEATER WITH MAGNET CLUTCH ASSEMBLY (for Cold Area Specification Vehicles)


    I034100E02
  1. Install the viscous with magnet clutch heater with the 2 bolt.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }

  1. Connect the connect.



24. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET (w/ Air Conditioning System)
  1. Install the bracket with the 4 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }



25. INSTALL NO. 2 INTERCOOLER SUPPORT BRACKET (w/ EGR Cooler)
  1. Install the bracket with the 2 bolts.

    Torque:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }



26. INSTALL INTERCOOLER SUPPORT BRACKET (w/ EGR Cooler)
  1. Install the bracket with the 2 bolts.

    Torque:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }



27. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


A097638E01
  1. Install the tensioner with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Firmly press and hold the tensioner against the cylinder block to eliminate any gaps in the areas labeled A in the illustration. Then uniformly tighten the 4 bolts.



28. INSTALL GENERATOR BRACKET
  1. Install the bracket with the bolt.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }



29. INSTALL GENERATOR ASSEMBLY


A111821E01
  1. Install the generator with the 2 bolts.

    Torque:
    62 N*m{ 632 kgf*cm , 46 ft.*lbf } for bolt A
    25 N*m{ 255 kgf*cm , 18 ft.*lbf } for bolt B

  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 1001 kgf*cm , 87 in.*lbf }

  1. Connect the generator connector.



30. INSTALL EXHAUST MANIFOLD


A149962E01
  1. w/ EGR Cooler:
    Install a new gasket, manifold, 8 new collars and 8 spacers to the cylinder head with 8 new nuts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

  1. w/o EGR Cooler:
    Install a new gasket, manifold and 8 spacers to the cylinder head with 8 new nuts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

    NOTICE:
    Make sure that the side of the collar with the smaller diameter faces the exhaust manifold.



31. INSTALL TURBOCHARGER SUB-ASSEMBLY (w/ EGR Cooler)
  1. Install the turbocharger (Click here).



32. INSTALL TURBOCHARGER SUB-ASSEMBLY (w/o EGR Cooler)
  1. Install the turbocharger (Click here).



33. INSTALL TURBINE OUTLET ELBOW (w/o EGR Cooler)


A110360
  1. Temporarily install a new gasket and the outlet elbow (with turbocharger stay) to the turbocharger with the 4 nuts.

  1. Temporarily install the stay with the 2 bolts.

  1. Tighten the 4 nuts of the turbocharger.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }

  1. Tighten the 2 bolts of the stay.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }



34. INSTALL VENTILATION HOSE HEAT INSULATOR (w/o EGR Cooler)
  1. Install the insulator with the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



35. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY (w/o EGR Cooler)


A098889E05
  1. Connect the pipe (with the 2 air hoses) and install the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 clamps of the No. 1 and No. 2 air hoses.

    Torque:
    6.5 N*m{ 66 kgf*cm , 57 in.*lbf }

  1. Connect the vacuum hose to the gas filter.

  1. Connect the manifold absolute pressure sensor connector.



36. INSTALL CRANKSHAFT PULLEY


A072417E02
  1. Align the pulley set key with the key groove of the pulley.

  1. Using SST, install the pulley bolt.

    SST
    09213-58014  
    09330-00021  

    Torque:
    365 N*m{ 3722 kgf*cm , 270 ft.*lbf }



37. INSTALL TIMING BELT


    A070691E02
  1. Check that the timing marks are aligned as shown in the illustration.

    HINT:
    If reusing the timing belt, align the points marked during removal, and install the belt with the arrow pointing in the direction of engine revolution.

    NOTICE:
    1. The engine should be cold.
    2. When turning the crankshaft, the valve heads will hit against the piston's top position. Do not turn it more than necessary.

  1. Using a 10 mm hexagon wrench, install the timing belt idler pulley and new washer with the bolt.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

  1. Check that the idler pulley moves smoothly.
    If it does not move smoothly, check the idler sub-assembly and washer.

  1. Install the timing belt to the pump drive shaft pulley, camshaft timing pulley and No. 1 timing belt idler in sequence.



    A070548E01
  1. Place the tensioner upright. Then set the press to the top of the tensioner.

    NOTICE:
    1. Do not scratch or deform the rod end.
    2. Press in the tensioner rod upward.
    3. Protect the tip of the push rod with a cloth in order to prevent damage.

  1. Using a press, slowly push in the push rod using 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force.

    NOTICE:
    Do not impose a load of over 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) to the push rod.

  1. Align the holes of the push rod and housing. Then pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.

  1. Install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.

  1. Tighten the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    NOTICE:
    Uniformly tighten the 2 bolts and install the tensioner.



    A059983E01
  1. Remove the 1.5 mm hexagon wrench from the tensioner.



    A070549E02
  1. Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.



38. INSTALL NO. 1 TIMING BELT COVER
  1. Install the timing belt cover with the 6 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Install the wire harness clamp.

  1. Install the water hose clamp with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



39. INSTALL ENGINE WIRE
  1. Install the engine wire to the engine.



40. REMOVE ENGINE STAND
  1. Attach the chain block and engine sling device to the engine hangers.

  1. Remove the engine from the engine stand.



41. INSTALL ENGINE ASSEMBLY


A098988E01
  1. Slowly lower the engine into the engine compartment.

  1. Install the engine mounting insulator with the 4 bolts and 4 nuts.

    Torque:
    38 N*m{ 387 kgf*cm , 28 ft.*lbf }

  1. Remove the 2 engine hangers.



42. INSTALL REAR END PLATE
  1. Install the end plate with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



43. INSTALL FLYWHEEL SUB-ASSEMBLY


A054047E01
  1. Clean the bolt holes.

  1. Apply adhesive to 2 or 3 threads of a new bolt end.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent



    A072424E02
  1. Using SST, hold the crankshaft.

    SST
    09213-58014  
    09330-00021  

  1. Install the flywheel on the crankshaft.



    A114803E01
  1. Uniformly install and tighten the 8 bolts in the sequence shown in the illustration.

    Torque:
    178 N*m{ 1815 kgf*cm , 131 ft.*lbf }

    NOTICE:
    Do not start the engine for at least 1 hour after the installation.



44. INSTALL CLUTCH DISC ASSEMBLY


    C112690E01
  1. Insert SST into the clutch disc. Then insert the SST (together with the clutch disc) into the flywheel.

    SST
    09301-00110  

    NOTICE:
    Take care not to insert the clutch disc facing the wrong direction.



45. INSTALL CLUTCH COVER ASSEMBLY


    D029623E01
  1. Align the matchmarks on the clutch cover and flywheel.

  1. Tighten the 6 bolts as described below.

    1. Determine the first bolt to be tightened by choosing the bolt closest to the knock pin.

    2. Uniformly tighten the 6 bolts in diametrically opposite pairs relative to the position of the first bolt. Use the illustration as a reference.

      Torque:
      19 N*m{ 195 kgf*cm , 14 in.*lbf }

  1. Lightly move SST up and down, and right and left.

    SST
    09301-00110  

  1. Check that the disc is in the center, and then tighten the bolts.



46. INSTALL COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System)
  1. Install the compressor with the 4 bolts.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }



47. CONNECT HOSES AND CONNECTORS


    G034367E04
  1. Using a union nut wrench, install the pressure feed tube.

    Torque:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).



    G035298E01
  1. Connect the 2 fuel hoses.

  1. Connect the vacuum pump hose.

  1. Connect the oil reservoir to pump hose.



    A226134
  1. for LHD:
    Connect the connectors.

    1. Connect the 4 ECU connectors.

    2. w/ A.D.D.
      Connect the 4WD control ECU connector.



    A149956
  1. for RHD:
    Connect the connectors.

    1. Connect the 4 ECU connectors.

    2. w/ A.D.D.
      Connect the 4WD control ECU connector.

  1. Connect the injector driver connectors.



    G035294E01
  1. Install the ground cable with the bolt.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }

  1. Connect the 2 engine room junction block connectors.

  1. Install the engine room junction block wire with the nut.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Install the engine room relay block cover (side).

  1. Install the engine room relay block cover (upper).



48. INSTALL RADIATOR ASSEMBLY
  1. Install the radiator (Click here).



49. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY


50. INSTALL AIR CLEANER ASSEMBLY
  1. Install the cleaner with the 2 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. w/ Intake Air Temperature Sensor:
    Connect the connector to the intake air temperature sensor.

  1. w/ Mass Air Flow Meter:
    Connect the connector to the mass air flow meter.

  1. Tighten the hose clamp.

  1. for Ventilation Hose Type:
    Connect the ventilation hose.



51. INSTALL BATTERY AND BATTERY TRAY


52. INSTALL BATTERY BRACKET


53. INSTALL TRANSMISSION ASSEMBLY
  1. for R151/R151F:
    Install the transmission (Click here).

  1. for G50:
    Install the transmission (Click here).



54. ADD ENGINE COOLANT
  1. Tighten the radiator drain cock plug by hand.

  1. Tighten the cylinder block drain cock plug.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



    A098989E01
  1. Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the reservoir tank's B line.

    Standard capacity:
    9.0 liters (9.5 US qts, 7.9 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    1. Please contact your TOYOTA dealer for further details.

    NOTICE:
    Never use water as a substitute for engine coolant.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
    If the coolant level drops below the B line, add TOYOTA SLLC to the B line.

  1. Install the radiator reservoir cap.



    A099591E01
  1. Using a wrench, install the vent plug.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Bleed air from the cooling system.

    1. Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.

    2. Maintain the engine speed at 2,500 to 3,000 rpm.

    3. Press the inlet and outlet radiator hoses several times by hand to bleed air.

      CAUTION:
      When pressing the radiator hoses:
      1. Wear protective gloves.
      1. Be careful as the radiator hoses are hot.
      1. Keep your hands away from the radiator fan.

    4. Stop the engine and wait until the coolant cools down to ambient temperature.

      CAUTION:
      Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    G036768E01
  1. After the coolant cools down, check that the coolant level is at the F line.
    If the coolant level is below the F line, add TOYOTA SLLC to the F line.



55. ADD FUEL


56. TIGHTEN FUEL TANK CAP ASSEMBLY


57. ADD ENGINE OIL
  1. Wipe the oil pan and drain plug before installing the plug.

  1. Install a new gasket and the drain plug.

    Torque:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }

  1. Add new oil.

    Oil capacity:

    Item
    Capacity
    Drain and refill with oil filter change
    6.9 liters (7.3 US qts, 6.1 Imp. qts)
    Drain and refill without oil filter change
    6.6 liters (7.0 US qts, 5.8 Imp. qts)
    Dry fill
    7.4 liters (7.8 US qts, 6.5 Imp. qts)

  1. Install the oil filler cap.



58. INSTALL HOOD SUB-ASSEMBLY
  1. Install the hood with the 4 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Connect the washer nozzle hose.

  1. Adjust the hood.



59. BLEED AIR FROM FUEL SYSTEM


    A098962E02
  1. Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.

    NOTICE:
    1. Hand pump pumping speed: Max. 2 strokes/ sec.
    2. The hand pump must be pushed with a full stroke during pumping.
    3. When the fuel pressure at the supply pump inlet port reaches a saturated pressure, the hand pump resistance increases.
    4. If pumping is interrupted during the air bleeding process, fuel in the fuel line may return to the fuel tank. Continue pumping until the hand pump resistance increases.
    5. If the hand pump resistance does not increase despite consecutively pumping 200 times or more, there may be a fuel leak between the fuel tank and fuel filter, the hand pump may be malfunctioning, or the vehicle may have run out of fuel.
    6. If air bleeding using the hand pump is incomplete, the common rail pressure does not rise to the pressure range necessary for normal use, and the engine cannot be started.

  1. Start the engine.

    NOTICE:
    1. Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
    2. Do not crank the engine continuously for more than 20 seconds. The battery may be discharged.
    3. Use a fully-charged battery.


    1. When the engine can be started, proceed to the next step.

    2. If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.

  1. Turn the ignition switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON and turn the intelligent tester on.

  1. Clear the DTCs (Click here).

  1. Start the engine.*1



    A194065E03
  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2

  1. Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3



  1. Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.


    A192848E05

    HINT:
    When the Active Test "Test the Fuel Leak" is used to change the pump control mode, the actual fuel pressure inside the common rail drops below the target fuel pressure when the Active Test is off, but this is normal and does not indicate a pump malfunction.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

  1. Clear the DTCs (Click here).

    HINT:
    It is necessary to clear the DTCs as DTC P1604 or P1605 may be stored when air is bled from the fuel system after replacing or repairing fuel system parts.

  1. Repeat steps *1 to *3.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

    OK:
    No DTCs are output.



60. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).



61. PERFORM REGISTRATION
  1. Perform registration of the injector compensation codes .

  1. Perform pilot quantity learning .



62. PERFORM INITIALIZATION
  1. Perform initialization of the crank time compensation reset function (Click here).



63. INSPECT FOR OIL LEAK


64. INSPECT FOR COOLANT LEAK


65. INSPECT FOR EXHAUST GAS LEAK


66. INSPECT FOR FUEL LEAK


67. CHECK ENGINE IDLE SPEED AND MAXIMUM SPEED

HINT:
  1. For more information about the intelligent tester, refer to its operator's manual.
  2. If an intelligent tester is not available, use a tachometer's tester probe as a substitute.



    C108852E01
  1. Connect the intelligent tester to the DLC3.



    A082779E58
  1. If a tester is not available, connect a tester probe of a tachometer to terminal 9 (TAC) of the DLC3 with SST.

    SST
    09843-18030  

  1. Inspect the idle speed.

    HINT:
    1. The engine is warmed up.
    2. The A/C switch is OFF.


    1. Start the engine and measure the idle speed.

      Standard idle speed:
      700 to 800 rpm

      If the idle speed is not as specified, perform the troubleshooting procedures in the Diagnostics section.

  1. Inspect the maximum speed.

    1. Start the engine.

    2. Fully depress the accelerator pedal.

    3. Measure the maximum speed.

      Standard maximum speed:
      4450 to 4750 rpm

      If the maximum speed is not as specified, perform the troubleshooting in the Diagnostics section.

  1. If the tester probe of the tachometer is connected to the DLC3, disconnect the tester probe with SST from terminal 9 of the DLC3.

  1. Disconnect the intelligent tester from the DLC3.



68. CHECK OIL LEVEL


69. INSTALL NO. 2 ENGINE UNDER COVER (for 4WD)
  1. Install the under cover with the 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



70. INSTALL NO. 1 ENGINE UNDER COVER (for 4WD)
  1. Install the under cover with the 4 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }