Home › ENGINE ยท 5L-E › STARTING › STARTER

STARTER > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    A118418
  1. Install the starter with the 2 bolts and nut.

    Torque:
    69 N*m{ 700 kgf*cm , 51 ft.*lbf }

  1. Install the stay with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Install the stay with the nut.

    Torque:
    12.3 N*m{ 125 kgf*cm , 9 ft.*lbf }

  1. Connect the terminal 30 wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }



    A118417
  1. Install the terminal cap.

  1. Connect the starter connector.



2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


3. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.