Home › ENGINE ยท 2KD-FTV › INTAKE › INTERCOOLER

INTERCOOLER > INSTALLATION

for Preparation Click here



1. INSTALL INTERCOOLER ASSEMBLY


    A149932
  1. Install a new gasket and the intake air connector with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A135919
  1. Install the intercooler with the 4 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



    A149934
  1. Tighten the 2 hose clamps of the No. 2 air hose.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }



    A149933
  1. Tighten the 2 hose clamps of the No. 1 air hose.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }



2. INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR


    A150479
  1. Install the sensor with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Attach the 2 clamps and connect the sensor connector.



3. INSTALL INTAKE AIR TEMPERATURE SENSOR
  1. Using a 22 mm deep socket wrench, install a new gasket and the IAT sensor.

    Torque:
    34 N*m{ 350 kgf*cm , 25 ft.*lbf }



    A135914
  1. Connect the IAT sensor connector.



4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


A135916
  1. Install the engine cover with the 3 bolts and 2 nuts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


6. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.