FUEL INJECTOR (w/ EGR Cooler) > REMOVAL |
| 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL |
| 2. REMOVE FUEL TANK CAP ASSEMBLY |
| 3. REMOVE INTERCOOLER ASSEMBLY |
Remove the intercooler assembly (Click here).
| 4. CHECK FOR INJECTOR COMPENSATION CODE |
Read the injector compensation code .
Check that compensation code of installed injector is same as code registered in ECM. If the code is not as specified, register the injector compensation code on the injector (Click here).
| 5. REMOVE NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY |
![]() |
Remove the 2 nuts and No. 3 injection pipe clamp.
![]() |
Remove the 2 bolts and 2 No. 2 injection pipe clamps.
![]() |
Using a 17 mm union nut wrench, loosen the union nuts and remove the No. 1, No. 2 and No. 3 injection pipes.
| 6. REMOVE EGR COOLER WITH ELECTRIC EGR CONTROL VALVE AND NO. 2 EGR VALVE |
Remove the EGR cooler with electric EGR control valve and No. 2 EGR valve (Click here).
| 7. REMOVE NO. 4 INJECTION PIPE SUB-ASSEMBLY |
![]() |
Remove the bolt and disconnect the injection pipe clamp.
![]() |
Using a 17 mm union nut wrench, loosen the union nuts and remove the No. 4 injection pipe.
| 8. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY |
![]() |
Remove the 3 bolts and disconnect the 4 connectors.
![]() |
Using a small screwdriver, remove the nozzle holder seal by prying the portion between the nozzle holder seal and the cutout part of the cylinder head cover.
Disconnect the ventilation hose.
![]() |
Remove the 10 bolts, 2 nuts, cylinder head cover and cylinder head cover gasket.
| 9. REMOVE INJECTOR ASSEMBLY |
![]() |
Remove the union bolt, 4 injector hollow screws, 5 gaskets and nozzle leakage pipe.
![]() |
Remove the 4 bolts, 4 washers, 4 nozzle holder clamps and 4 injectors.
Remove the O-ring from each injector.
Remove the 4 injection nozzle seats from the cylinder head.