ECD SYSTEM > ECM Power Source Circuit |

| 1.INSPECT ECM (+B VOLTAGE) |
![]() |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E4-1 (+B) - E6-7 (E1) | Always | 11 to 14 V |
| *a | Component with harness connected (ECM) |
|
| ||||
| OK | ||
| ||
| 2.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND) |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E6-7 (E1) - Body ground | Always | Below 1 Ω |
Reconnect the ECM connector.
|
| ||||
| OK | |
| 3.INSPECT ECM (IGSW VOLTAGE) |
![]() |
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| E4-9 (IGSW) - E6-7 (E1) | Ignition switch ON | 11 to 14 V |
| *a | Component with harness connected (ECM) |
|
| ||||
| OK | |
| 4.INSPECT ECM (MREL VOLTAGE) |
![]() |
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| E4-8 (MREL) - E6-7 (E1) | Ignition switch ON | 11 to 14 V |
| *a | Component with harness connected (ECM) |
|
| ||||
| OK | |
| 5.INSPECT NO. 1 INTEGRATION RELAY (MAIN RELAY) |
Inspect the No. 1 integration relay (MAIN relay) (Click here).
|
| ||||
| OK | |
| 6.CHECK HARNESS AND CONNECTOR (MAIN RELAY - ECM, MAIN RELAY - BODY GROUND) |
Check the harness and connector between the integration relay (MAIN relay) and ECM.
Remove the integration relay (MAIN relay) from the No. 1 engine room R/B and J/B.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1J-4 - E4-1 (+B) | Always | Below 1 Ω |
| 1J-2 - E4-8 (MREL) | Always | Below 1 Ω |
| 1J-4 or E4-1 (+B) - Body ground | Always | 10 kΩ or higher |
| 1J-2 or E4-8 (MREL) - Body ground | Always | 10 kΩ or higher |
Reconnect the ECM connector.
Reinstall the integration relay.
Check the harness and connector between the integration relay (MAIN relay) and body ground.
Remove the integration relay (MAIN relay) from the No. 1 engine room R/B and J/B.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1J-3 - Body ground | Always | Below 1 Ω |
Reinstall the integration relay.
|
| ||||
| OK | ||
| ||
| 7.INSPECT IGNITION SWITCH |
![]() |
Disconnect the ignition switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| 5 (AM2) - 6 (IG2) | LOCK | 10 kΩ or higher |
| 5 (AM2) - 6 (IG2) | ON | Below 1 Ω |
| *1 | Ignition Switch |
Reconnect the ignition switch connector.
|
| ||||
| OK | ||
| ||