Home › ENGINE ยท 1KD-FTV › EMISSION CONTROL › EGR VALVE

EGR VALVE > INSTALLATION

for Preparation Click here



1. INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY
  1. Install a new gasket and the electric EGR control valve.



2. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY


G037199E01
  1. Install 2 new gaskets and the pipe with the 2 nuts and 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    HINT:
    The gasket's claws should be on the pipe side.



3. INSTALL INTAKE AIR CONNECTOR


    A110300
  1. Install a new gasket and the air connector with the 2 nuts and bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



4. INSTALL NO. 2 INTAKE AIR CONNECTOR BRACKET
  1. Install the No. 2 intake air connector bracket with the 3 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



5. INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY (for EGR)
  1. Install the electric vacuum regulating valve together with the bracket with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 3 vacuum hoses.

  1. Connect the 2 connectors.



6. INSTALL DIESEL THROTTLE BODY ASSEMBLY
(Click here)