GENERATOR > INSTALLATION |
| 1. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the generator with the 2 bolts.
Install the generator wire with the nut and 2 bolts.
Install the terminal cap.
Connect the generator connector.
| 2. INSTALL DRIVE BELT |
![]() |
While turning the belt tensioner counterclockwise, align its holes, and then insert a bar with a diameter of 6 mm (0.24 in.) into the holes to fix the belt tensioner.
Install the V-ribbed belt.
![]() |
Put the V-ribbed belt on everything except the PS pump as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the PS pump.
While turning the belt tensioner counterclockwise, remove the pin.
| 3. INSTALL V-BANK COVER |
Install the V-bank cover with the 2 nuts.
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |