INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1) |
 |
- Apply a light coat of engine oil to a new O-ring of the oil control valve.
- Install the oil control valve with the bolt.
-
Torque:
- 9.0 N*m{
92 kgf*cm
, 80 in.*lbf
}
- NOTICE:
- Be careful that the O-ring is not cracked when installing the oil control valve.
Connect the camshaft timing oil control valve connector.
| 2.
INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2) |
 |
- Apply a light coat of engine oil to a new O-ring of the oil control valve.
- Install the oil control valve with the bolt.
-
Torque:
- 9.0 N*m{
92 kgf*cm
, 80 in.*lbf
}
- NOTICE:
- Be careful that the O-ring is not cracked when installing the oil control valve.
Connect the oil control valve connector.
| 3.
INSTALL THROTTLE BODY
|
 |
Install a new gasket to the intake air surge tank.
Install the throttle motor connector.
-
Torque:
- 11 N*m{
112 kgf*cm
, 9 ft.*lbf
}
| 4.
INSTALL AIR CLEANER ASSEMBLY
|
 |
-
Torque:
- 8.0 N*m{
82 kgf*cm
, 71 in.*lbf
}
| 5.
INSTALL NO. 2 VENTILATION HOSE |
|
| 6.
INSTALL V-BANK COVER
|
 |
-
Torque:
- 7.5 N*m{
76 kgf*cm
, 66 in.*lbf
}
| 7.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 8.
PERFORM INITIALIZATION |
 |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal