2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR

  1. A111701
    Install a new gasket to the sensor.

  1. Install the sensor.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the sensor connector.


2. INSTALL INTAKE MANIFOLD

A076536E01
  1. Set a new gasket on each cylinder head.

    NOTICE:
    1. Align the port holes of the gasket and cylinder head.
    2. Be careful of the installation direction.

  1. Set the intake manifold on the cylinder heads.

  1. A076533E01
    Install and uniformly tighten the 10 bolts in several passes.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }

  1. Connect the 6 fuel injector connectors.


3. INSTALL INTAKE AIR SURGE TANK

  1. A075648E01
    Install a new gasket to the intake air surge tank.

  1. Using an 8 mm hexagon socket wrench, install the intake air surge tank with the 4 bolts. Install the 2 nuts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. A076502E01
    Install the 2 surge tank stays with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the oil baffle plate with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. A075646E01
    Install the throttle body bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the 3 wire harness clamps and hose clamp.

  1. Connect the throttle body with motor connector.

  1. Connect the 2 VSV connectors.

  1. A075645E01
    Connect the ventilation hose.

  1. A075644E01
    Connect the purge line hose.

  1. A076500E02
    Connect the 2 water by-pass hoses.


4. INSTALL THROTTLE BODY
  1. Install a new gasket to the intake air surge tank.

  1. Install the throttle motor connector.

    Torque:
    11 N*m{ 112 kgf*cm , 9 ft.*lbf }


5. INSTALL AIR CLEANER ASSEMBLY

Torque:
8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


6. CONNECT NO. 2 VENTILATION HOSE

7. INSTALL V-BANK COVER

Torque:
7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


8. ADD ENGINE COOLANT
  1. Tighten all the plugs and fill the radiator with TOYOTA Super Long Life Coolant (SLLC).

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf } for cylinder block drain cock plug

    Standard capacity:
    Item
    Specified Condition
    A/T
    9.8 liters (10.4 US qts, 8.6 Imp. qts)
    M/T
    8.5 liters (9.0 US qts, 7.5 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic and technology consists of a combination of low phosphates and organic acids).
    2. Please contact your TOYOTA dealer for further details.

    NOTICE:
    Never use water as a substitute for engine coolant.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.

  1. Install the radiator cap.

  1. Bleed air from the cooling system.

    1. Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.

    2. Maintain the engine speed at 2,000 to 2,500 rpm.

    3. Press the inlet and outlet radiator hoses several times by hand to bleed air.

      CAUTION:
      When pressing the radiator hoses:
      1. Wear protective gloves.
      2. Be careful as the radiator hoses are hot.
      3. Keep your hands away from the radiator fan.

  1. Stop the engine and wait until the coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A112081E01
    Check the coolant level in the radiator reservoir.
    If the coolant level is low, add SLLC to the reservoir F line.


9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

10. CHECK FOR ENGINE COOLANT LEAKS
  1. Check for engine coolant leaks (Click here).


11. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

← INSPECTION (from Jun 2011)INSTALLATION (Aug 2012 – Jul 2013) →