Home › ENGINE › 1KD-FTV ENGINE CONTROL SYSTEM › ECD SYSTEM (w/ EGR Cooler)
ECM Power Source Circuit
Circuit diagnosis · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 Aug 2013 – Jul 2014 from Aug 2014
DESCRIPTION
When the ignition switch is turned ON, the battery voltage is applied to terminal IGSW of the ECM. The ECM "MREL" output signal causes a current to flow to the coil, closing the contacts of the MAIN relay and supplying power to terminal +B of the ECM. WIRING DIAGRAM
INSPECTION PROCEDURE
NOTICE:
If the ECM is replaced, the new ECM needs initialization (Click here ).
1. CHECK ECM (+B VOLTAGE)
Turn the ignition switch ON.
Measure the voltage of the ECM connectors.
Standard voltage:
Tester Connection
Specified Condition
+B (E5-1) - E1 (E7-7)
11 to 14 V
OK
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (Click here )
NG
2. CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
Disconnect the E7 ECM connector.
Measure the resistance of the wire harness side connector.
Standard resistance:
Tester Connection
Specified Condition
E1 (E7-7) - Body ground
Below 1 Ω
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
3. CHECK ECM (IGSW VOLTAGE)
Turn the ignition switch ON.
Measure the voltage of the ECM connectors.
Standard voltage:
Tester Connection
Specified Condition
IGSW (E5-9) - E1 (E7-7)
11 to 14 V
OK
NG
4. INSPECT FUSE (IGN FUSE)
Remove the IGN fuse from the instrument panel J/B.
Measure the resistance of the fuse.
Standard resistance:
Below 1 Ω
NG
CHECK FOR SHORT IN ALL HARNESS AND COMPONENTS CONNECTED TO FUSE, AND REPLACE FUSE
OK
5. INSPECT IGNITION SWITCH ASSEMBLY
Disconnect the I6 ignition switch connector.
Measure the resistance of the ignition switch.
Standard resistance:
Tester Connection
Switch Condition
Specified Condition
5 (AM2) - 6 (IG2)
LOCK
10 kΩ or higher
5 (AM2) - 6 (IG2)
ON
Below 1 Ω
NG
REPLACE IGNITION SWITCH ASSEMBLY
OK
6. CHECK ECM (MREL VOLTAGE)
Turn the ignition switch ON.
Measure the voltage of the ECM connectors.
Standard voltage:
Tester Connection
Specified Condition
MREL (E5-8) - E1 (E7-7)
11 to 14 V
NG
OK
7. INSPECT FUSE (EFI FUSE)
Remove the EFI fuse from the engine room junction block.
Measure the resistance of the fuse.
Standard resistance:
Below 1 Ω
NG
CHECK FOR SHORT IN ALL HARNESS AND COMPONENTS CONNECTED TO FUSE, AND REPLACE FUSE
OK
8. INSPECT INTEGRATION NO.1 RELAY (MAIN RELAY)
Remove the integration relay from the engine room junction block (Click here ).
Measure the voltage of the integration relay
Standard voltage:
Tester Connection
Condition
Specified Condition
1J-4 - Body ground
Ignition switch ON
11 to 14 V
NG
OK
9. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY (MAIN RELAY) - ECM)
Disconnect the 1J integration relay connector from the engine room J/B (Click here ).
Disconnect the E5 ECM connector.
Measure the resistance of the wire harness side connectors.
Standard resistance (check for open):
Tester Connection
Specified Condition
1J-4 - +B (E5-1)
Below 1 Ω
Standard resistance (check for short):
Tester Connection
Specified Condition
1J-4 or +B (E5-1) - Body ground
10 kΩ or higher
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY (MAIN RELAY) - ECM)
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (+B TERMINAL OF ECM - BATTERY POSITIVE TERMINAL)