Removal / installation · Vehicles built Jun 2011 – Jul 2013
Versions by build date: Jun 2011 – Jul 2013from Aug 2013
1.
INSTALL VANE PUMP ASSEMBLY
Coat a new O-ring with MP grease and install it to the vane pump.
Install the pump with the 2 nuts.
Torque:
39 N*m{
398 kgf*cm
, 29 ft.*lbf
}
2.
CONNECT PRESSURE FEED TUBE ASSEMBLY
Using a union nut wrench, connect the tube to the vane pump with a new gasket and the union bolt.
Torque:
44 N*m{
449 kgf*cm
, 33 ft.*lbf
}
NOTICE:
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).
3.
CONNECT OIL RESERVOIR TO PUMP HOSE
Connect the oil reservoir to the pump hose with the clamp.
HINT:
Install the pump side of the hose so that the paint mark faces the front of the vehicle. Align the reservoir tank side of the hose to the tank port rib.
Make sure the clamp's claw on the pump side faces the front of the vehicle. Also make sure the clamp's claw on the reservoir tank side faces the top of the vehicle.