INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL VANE PUMP ASSEMBLY |
 |
- Install the vane pump with the 2 bolts.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
- Install the wire harness clamp bracket with the bolt.
-
Torque:
- 8.0 N*m{
82 kgf*cm
, 71 in.*lbf
}
Connect the oil pressure switch connector.
- NOTICE:
- Make sure that no oil adheres to the connector.
| 2.
CONNECT PRESSURE FEED TUBE ASSEMBLY |
 |
Install a new gasket onto the pressure feed tube.
Install the pressure feed tube with the union bolt.
-
Torque:
- 49 N*m{
500 kgf*cm
, 36 ft.*lbf
}
| 3.
CONNECT OIL RESERVOIR TO PUMP HOSE |
 |
Connect the hose with the clip.
| 4.
INSTALL FAN & GENERATOR V BELT
|
 |
While turning the belt tensioner counterclockwise, align its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.
Install the V-ribbed belt.
While turning the belt tensioner counterclockwise, remove the bar.
- If it is hard to install the V-ribbed belt, perform the following procedure.
Put the V-ribbed belt on everything except the P/S pump as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.
| 5.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 6.
PERFORM INITIALIZATION |
 |
Perform initialization (Click here ).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
| 7.
ADD POWER STEERING FLUID |
 |
(Click here)
| 8.
BLEED POWER STEERING FLUID |
|
| 9.
CHECK FOR POWER STEERING FLUID LEAKAGE |
|