INSTALLATION
Removal / installation · Vehicles built Aug 2012 – Jul 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL STARTER ASSEMBLY |
 |
- Connect the ground cable and install the starter with the nut and bolt.
-
Torque:
- 68 N*m{
693 kgf*cm
, 50 ft.*lbf
}
- HINT:
- Make sure to connect the ground cable with the nut as shown in the illustration.
Install the starter wire to terminal 30 with the nut.
-
Torque:
- 9.8 N*m{
100 kgf*cm
, 87 in.*lbf
}
- Connect the starter connector.
| 2.
CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY
|
 |
Install the release cylinder with the 2 bolts.
-
Torque:
- 12 N*m{
120 kgf*cm
, 9 ft.*lbf
}
| 3.
INSTALL FRONT FENDER SEAL |
 |
Install the seal with the 5 clips.
| 4.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
 |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).