INSTALLATION
Removal / installation · Vehicles built Aug 2012 – Jul 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL STARTER ASSEMBLY |
for Automatic Transmission:
Connect the ground cable and install the starter assembly with the 2 nuts and bolt.

- Torque:
- 68 N*m{ 693 kgf*cm , 50 ft.*lbf }
Text in Illustration *1
Ground Cable
- HINT:
- Make sure to connect the ground cable with the nut as shown in the illustration.
for Manual Transmission:
Connect the ground cable and install the starter assembly with the nut and bolt.

- Torque:
- 68 N*m{ 693 kgf*cm , 50 ft.*lbf }
Text in Illustration *1
Ground Cable
- HINT:
- Make sure to connect the ground cable with the nut as shown in the illustration.
Install the starter wire to terminal 30 with the nut.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
Connect the starter connector.
| 2. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY (for Automatic Transmission) |
![]() ![]() |
Coat a new O-ring with ATF, and install it to the oil filler tube.
Coat a new O-ring with ATF, and install it to the oil filler tube.
- Torque:
- 12 N*m{ 122 kgf*cm , 9 ft.*lbf }
Install the oil level gauge.
| 3. CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transmission) |
![]() ![]() |
Install the release cylinder with the 2 bolts.
- Torque:
- 12 N*m{ 120 kgf*cm , 9 ft.*lbf }
| 4. INSTALL FRONT FENDER SEAL |
Install the front fender seal with the 5 clips.
| 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


