INSTALLATION
Removal / installation · Vehicles built from Aug 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
Install a new gasket and the diesel throttle body assembly with the 2 bolts and 2 nuts.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the 2 connectors.
| 2. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY (w/o Intercooler) |
Connect the pipe (with the 2 air hoses) and install the bolt.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Tighten the 2 clamps.
Connect the vacuum hose to the gas filter.
Connect the manifold absolute pressure sensor connector.
w/ No. 1 Engine Cover
Install the engine cover bracket with the 2 bolts.
- Torque:
- 18 N*m{ 184 kgf*cm , 13 ft.*lbf }
Attach the 4 claws to the pins of the engine cover bracket and install the No. 1 engine cover sub-assembly.
| 3. INSTALL INTERCOOLER ASSEMBLY |
